Telescopic Boom Series
Models SJ61T & SJ66T
194312
December 2007
Page 169
Section 5 - Procedures
Service and Maintenance
on the box. Note the color and markings for each
wire.
3.
Insert a small flat screwdriver into the slot beside
the wire position in the terminal strip to depress
the spring mechanism. Insert the end of the wire,
then pull out the screwdriver to secure it.
02
02
02
60/04
20D/41
34A/34
34A/35
36A/36
36A/37
82-/118
M62321AA
Control Console
4.
Once the wires are all connected, close the lid and
turn the two box latches to fasten it.
The machine can now be operated for boom
repositioning purposes. Refer to the operator's manual
for information on using emergency power.
Fly Boom Section Removal
Procedure:
1.
On the platform end of the boom, mark and
remove the slave cylinder hoses on the top side of
the fly boom tip. Crack the lines slowly to relieve
any residual pressure. Provide a suitable container
or rags to catch any oil spillage. Cap hoses and
ports to keep them clean.
2.
Remove the fasteners for the cable/hose tube
support on the side of the fly boom.
M62030AA
Platform Level Hoses and Cable/hose Tube Support
3.
Remove the top and side wear pads and shims
inside the platform end of the mid boom. Store
shims with appropriate parts for reassembly.
M62057AA
Remove Top and Side Wear Pads
4.
Place a suitable stand that can bear the weight of
the fly boom ahead of the machine.
5. Attach a lifting sling to the fly boom tip and using
suitable lift equipment, slide it out
2/3
of the way.
Pull it out straight to avoid binding.
Summary of Contents for SJ61T
Page 1: ...TELESCOPIC BOOMS MODELS SJ61T SJ66T 194312AE February 2017 SERVICE MANUAL...
Page 42: ...Page 42 December 2007 Telescopic Boom Series Models SJ61T SJ66T 194312 Notes...
Page 230: ...Page 230 December 2007 Telescopic Boom Series Models SJ61T SJ66T 194312 Notes...
Page 231: ......
Page 232: ...www skyjack com P litelig lift l sninger av folk som bryr seg...