www.sky-frame.com
07.12.2016
13.4.1.44
9.4
Teach-in run procedure
Typical procedure for a teach-in run:
1. Leaves opened all the way
2. ( A ) closes approx. 100mm
3. ( A‘ ) moves to ( A ), ( A‘‘ ) moves to ( A‘ )
4. ( A ) closes approx. 100mm
5. ( B‘ ) moves to ( B ), ( B‘‘ ) moves to ( B‘ )
6. ( A ) + ( A‘ ) + ( A‘‘ ) and ( B ) + ( B‘ ) + ( B‘‘ ) open fully
7. ( B ) + ( B‘ ) + ( B‘‘ ) close fully
8. ( A ) + ( A‘ ) + ( A‘‘ ) close fully
9. ( A ) + ( A‘ ) + ( A‘‘ ) and ( B ) + ( B‘ ) + ( B‘‘ ) open fully
System stops in open position = teach-in run complete
The system is now fully taught and is ready for the first function check.
Put the wiring diagram in the service opening and close it again.