
EN
55
11. DECOMMISSIONING
See the corresponding illustrations in manual B.
Danger
Working on electric installations without proper precautions will result in the risk of elec-
tric shock, and thus cause severe injury or death.
▶ Make sure that connection of the electrical power cannot occur during installation.
▶ Put up caution tape and warning signs to mark the working areas. Make sure no
unauthorized persons enter the working areas.
1. Turn off the input power of the wallbox and make sure that the power stays off
by adding warning signs to avoid accidental restart of power.
2. Use a plastic card or similar plastic tool for removing the bezel in a gentle way,
without damaging it.
3. Dismount the screws of the front cover. Remove the front cover and hold it
close to the main assembly while disconnecting the HMI cable and, optionally, if
present, the RFID cable.
4. To continue dismounting the wallbox, follow the installation steps from Install
wallbox in reverse order.
12. DISPOSAL
After decommissioning the wallbox, have the device disposed of in compliance with
applicable local disposal regulations.
According to WEEE standards, this wallbox is labeled with the
crossed-out waste bin. This indicates that the wallbox must not
be disposed of in household waste. Instead, dispose of the wallbox
at a local collection point for electric/electronic devices in order to
enable recycling and thus avoiding negative and hazardous impacts
on the environment. Ask your city or local authorities for respective
addresses.
Recycling of materials saves raw materials and energy and makes
a major contribution to conserving the environment.
Summary of Contents for iV Charger
Page 1: ...KODA iV Charger Charger Connect Charger Connect EN ES PL EL Manual Part A...
Page 2: ......
Page 4: ......
Page 5: ...KODA iV Charger Charger Connect Charger Connect Manual Part A EN...
Page 6: ......
Page 58: ......
Page 59: ...KODA iV Charger Charger Connect Charger Connect Manual Part A ES...
Page 60: ......
Page 112: ......
Page 113: ...KODA iV Charger Charger Connect Charger Connect Manual Part A PL...
Page 114: ......
Page 166: ......
Page 167: ...KODA iV Charger Charger Connect Charger Connect Manual Part A EL...
Page 168: ......
Page 171: ...EL 171 B 5 1 B 1 a I...
Page 174: ...EL 174 wallbox wallbox wallbox wallbox wallbox...
Page 181: ...EL 181 NFC NFC NFC KODA iV Charger Connect KODA iV Charger Connect...
Page 182: ...EL 182 Plug Charge Plug Charge KODA iV Charger Connect KODA iV Charger Connect wallbox wallbox...
Page 185: ...EL 185 300 mm 1000 mm min 500 mm 300 mm 300 mm Ethernet DIP...
Page 190: ...EL 190 wallbox wallbox wallbox 5 WALLBOX...
Page 192: ...EL 192 c a wallbox I wallbox II T30 III 2 wallbox wallbox...
Page 198: ...EL 198 6 DIP DIP 5 A B A 1 0 DIP DIP 0 0 0 1 1...
Page 200: ...EL 200 DIP 5 wallbox 1 2 3 4 5 0 1 2 3 4 5 1 1 2 3 4 5 wallbox DIP 0000x wallbox DIP wallbox...
Page 213: ...EL 213 wallbox wallbox wallbox wallbox wallbox wallbox DIP wallbox LED...
Page 217: ...EL 217 11 1 wallbox 2 3 HMI RFID 4 wallbox wallbox 12 wallbox wallbox wallbox wallbox...
Page 220: ...NOTES...
Page 221: ......
Page 222: ...NOTES...
Page 223: ......
Page 225: ...KODA iV Charger Charger Connect Charger Connect EN Manual Part B...
Page 228: ...4 EN 1 2 3 4 a b 5 1 INSTALL WALL BRACKET A 5 1 Manual part A 5 1 2 4 1 3...
Page 229: ...5 EN 5 2 PREPARE MAIN ASSEMBLY FOR INSTALLATION A 5 2 Manual part A 5 2 1...
Page 230: ...6 EN 2...
Page 231: ...7 EN 5 3 MOUNT MAIN ASSEMBLY ONTO WALL BRACKET A 5 3 Manual part A 5 3 1 2 1 2...
Page 233: ...9 EN a b c A KODA iVCharger Connect with kWh meter...
Page 234: ...10 EN a b c B KODA iVCharger and KODA iVCharger Connect without kWh meter...
Page 235: ...11 EN 2 a b c 2...
Page 236: ...12 EN a b c d 3...
Page 237: ...13 EN a b 4 6 5...
Page 238: ...14 EN a b c 7...
Page 239: ...15 EN a b C 8...
Page 240: ...16 EN...
Page 241: ...17 EN 9 11 10...
Page 242: ...18 EN 11 DECOMMISSIONING A 11 Manual part A 11 CARD...