8. COMMISSIONING
General Commissioning
Before connecting the wallbox to the vehicle:
1. Clean the connection zone.
2. Check wall mounting for stability.
3. Check that all screws and terminal connections are tight.
4. Make sure there are no knock-out holes for cable routing left open. Seal them
with blind plugs if there is no cable routed through them.
5. Make sure all cable glands are tightly closed.
6. Perform visual inspection according to commissioning protocol.
7. Switch on the input power to the wallbox.
8. Check HMI LED status indication.
9. Perform electric commissioning according to commissioning protocol and nor-
mative requirements and additional local installation requirements (if applicable).
10. Perform functional tests with a simulator or an EV and simultaneously check
HMI LED status indication.
11. Fill-in commissioning report.
If you need a commissioning report, fi nd an example of it at www.elli.eco/download
9. MAINTENANCE
The owner of the wallbox is responsible for the maintenance of the charging station, where-
by both the law regarding the safety of persons, animals, and property must be observed, as
well as the installation regulations in force in the country of use.
1. Dirt and natural organic matter on the outside of the charging station can be
cleaned off using a damp soft cloth.
2. Check the charge plug for damage and for foreign matter. Clean if necessary.
3. Have the wallbox and its installation inspected by an electrician on a regular
basis and in compliance with your local country installation guidelines.
Summary of Contents for iV Charger
Page 1: ...KODA iV Charger Charger Connect Charger Connect EN ES PL EL Manual Part A...
Page 2: ......
Page 4: ......
Page 5: ...KODA iV Charger Charger Connect Charger Connect Manual Part A EN...
Page 6: ......
Page 58: ......
Page 59: ...KODA iV Charger Charger Connect Charger Connect Manual Part A ES...
Page 60: ......
Page 112: ......
Page 113: ...KODA iV Charger Charger Connect Charger Connect Manual Part A PL...
Page 114: ......
Page 166: ......
Page 167: ...KODA iV Charger Charger Connect Charger Connect Manual Part A EL...
Page 168: ......
Page 171: ...EL 171 B 5 1 B 1 a I...
Page 174: ...EL 174 wallbox wallbox wallbox wallbox wallbox...
Page 181: ...EL 181 NFC NFC NFC KODA iV Charger Connect KODA iV Charger Connect...
Page 182: ...EL 182 Plug Charge Plug Charge KODA iV Charger Connect KODA iV Charger Connect wallbox wallbox...
Page 185: ...EL 185 300 mm 1000 mm min 500 mm 300 mm 300 mm Ethernet DIP...
Page 190: ...EL 190 wallbox wallbox wallbox 5 WALLBOX...
Page 192: ...EL 192 c a wallbox I wallbox II T30 III 2 wallbox wallbox...
Page 198: ...EL 198 6 DIP DIP 5 A B A 1 0 DIP DIP 0 0 0 1 1...
Page 200: ...EL 200 DIP 5 wallbox 1 2 3 4 5 0 1 2 3 4 5 1 1 2 3 4 5 wallbox DIP 0000x wallbox DIP wallbox...
Page 213: ...EL 213 wallbox wallbox wallbox wallbox wallbox wallbox DIP wallbox LED...
Page 217: ...EL 217 11 1 wallbox 2 3 HMI RFID 4 wallbox wallbox 12 wallbox wallbox wallbox wallbox...
Page 220: ...NOTES...
Page 221: ......
Page 222: ...NOTES...
Page 223: ......
Page 225: ...KODA iV Charger Charger Connect Charger Connect EN Manual Part B...
Page 228: ...4 EN 1 2 3 4 a b 5 1 INSTALL WALL BRACKET A 5 1 Manual part A 5 1 2 4 1 3...
Page 229: ...5 EN 5 2 PREPARE MAIN ASSEMBLY FOR INSTALLATION A 5 2 Manual part A 5 2 1...
Page 230: ...6 EN 2...
Page 231: ...7 EN 5 3 MOUNT MAIN ASSEMBLY ONTO WALL BRACKET A 5 3 Manual part A 5 3 1 2 1 2...
Page 233: ...9 EN a b c A KODA iVCharger Connect with kWh meter...
Page 234: ...10 EN a b c B KODA iVCharger and KODA iVCharger Connect without kWh meter...
Page 235: ...11 EN 2 a b c 2...
Page 236: ...12 EN a b c d 3...
Page 237: ...13 EN a b 4 6 5...
Page 238: ...14 EN a b c 7...
Page 239: ...15 EN a b C 8...
Page 240: ...16 EN...
Page 241: ...17 EN 9 11 10...
Page 242: ...18 EN 11 DECOMMISSIONING A 11 Manual part A 11 CARD...