5. Assembling of Extension Tube and Sensor

SKIPPER Electronics AS

SB-100-SB Operation and Installation Manual

Summary of Contents for SB-100-SB

Page 1: ...rt skipper no 0612 Oslo Co reg no NO 965378847 MVA Norway www skipper no Document no DM BSB100 SB Rev 1349A Date 2019 02 12 Single Bottom Sea Valve SB 100 SB Operation and Installation Manual Handle location 65 190 685 200 Min 1000mm free height NB This layer is out of scale Full scale in Model layer ...

Page 2: ...sont interdites sauf autorisation expresse Tout manquement à cette règle est illicite et expose son auteur au versement de dommeges et intèrèts Copying of this document and giving it to others and the use or communication of contents thereof are forbidden without express authority Offenders are liable to the payment of damages Sin nuestra expresa autorización queda terminantemente prohibida la rep...

Page 3: ...LY ORIENTATION NOT NECESSARY 8 5 ASSEMBLING OF EXTENSION TUBE AND SENSOR 9 6 SENSOR INSTALLATION 10 7 CLAMP UNIT MOUNTING 11 8 FINAL ASSEMBLY 13 9 SENSOR REMOVAL 14 10 RE INSTALLATION 15 11 DB 100 SENSORS 16 12 100 MM SINGLE BOTTOM BALL VALVE 17 13 MAINTENANCE 18 SKIPPER Electronics AS SB 100 SB Operation and Installation Manual ...

Page 4: ...the centerline as possible Optimal system operation is achieved by fitting the transducer sensor as deep as possible on the hull The active surface of the sensor must be installed with front face a maximum of 1 degree to the ships horizontal plane Speed Logs The active surface of the transducer must be installed with front face a maximum of 7 degree to the ships horizontal plane Echo Sounder Do no...

Page 5: ...itions if GA drawings General arrangements lines drawings and frame drawings are made available for study Condition The welding to hull structures and structural support of the items may be subject to separate approval by classification societies for each installation on board a ship Note All Item X references on the following pages can be found on drawing 100 mm Single Bottom Ball Valve SKIPPER E...

Page 6: ...9 02 12 The Sea Valve should be placed in a service accessible place large enough for installation and disassembly of the sensor unit 2 Space considerations SKIPPER Electronics AS SB 100 SB Operation and Installation Manual ...

Page 7: ...lve from being polluted by welding debris WELDING NOTES All bottom parts and flanges for welding are precisely machined parts During welding of these parts to the ship s hull plates careful attention must be paid to avoid construction strain on the bottom parts and flanges Let parts cool down during welding Over heating may change fit and form and result in non conformity with intended sensor tran...

Page 8: ... be upwards All 8 nuts and washers should be mounted not tightened Step 2 Place the plastic alignment tube all the way into the sea valve Tighten 8 nuts ball valve to bottom flange Tighten 8 nuts Intermediate element to ball valve Remove the plastic alignment tool Caution must be taken when mounting seavalves that all parts are aligned correctly and that the inside is clean DO NOT use liguid seala...

Page 9: ...Page 9 of 18 Date 2019 02 12 5 Assembling of Extension Tube and Sensor SKIPPER Electronics AS SB 100 SB Operation and Installation Manual ...

Page 10: ...e element Item 7 Apply grease to the O ring Insert the 2 thread bolts Item 11 through the flange and secure with 2 x M16 counter nuts Item 28 Torque 130 Nm Lower the sensor housing carefully down to the top of the valve piston 6 Sensor installation SKIPPER Electronics AS SB 100 SB Operation and Installation Manual ...

Page 11: ...ers Item 29 and nuts Item 28 Torque 130 Nm Mount in following order 2 x gasket Item 12 Washer Item 17 Nut M50 Item 13 2 x M16 nuts Item 28 Clamp Unit Item 10 2 x M16 nuts Item 28 with spring washer Item 29 7 Clamp Unit mounting SKIPPER Electronics AS SB 100 SB Operation and Installation Manual ...

Page 12: ...Open Sea Valve lower sensor unit and Extension Tube Rotate the Extension Tube to align the sensor to point forward ahead only needed for Speed Log Use the flattened area on the Extension Tube to find correct direction See fig 8 Final Assembly SKIPPER Electronics AS SB 100 SB Operation and Installation Manual ...

Page 13: ...tom flange After the ship is afloat it is necessary to let the air out of the Sea Valve Loosen the nut M50 let the air out and tighten nut again Protect sensor When launching ship lift sensor 50 mm When dry docking ship lift sensor 50 mm Forward Ahead 8 Final assembly SKIPPER Electronics AS SB 100 SB Operation and Installation Manual ...

Page 14: ...Page 14 of 18 Date 2019 02 12 9 Sensor removal SKIPPER Electronics AS SB 100 SB Operation and Installation Manual ...

Page 15: ...rque 40Nm 3 Screw the 2 Nuts M16 sligtly up to the Clamp Unit 4 Tighten the 2 Nuts M16 with lock washer on 1 2 3 4 Mounting order Nut M50 and Clamp Unit the opposite side Torque 130 Nm The Clamp Unit must be fitted on Top of Nut M50 to lock the Nut This is done to give extra security Extension Tube Centre Line Guide Bar Ship Forward Ahead 10 Re installation SKIPPER Electronics AS SB 100 SB Operati...

Page 16: ...N050BELX 50kHz 40m cable ETN050XGI 50kHz 40m cable Protection Plate DB 2050 Rev 00 TC 2019 Rev 00 DB 2023 Rev 02 DL850S27G LA 40m 40m ETN050GI 50kHz 25m cable ETN050BEL 50kHz 25m cable ETN200SG 200kHz 25m cable ETN200FSX 200kHz 40m cable Transducer for echo sounder Transducer for echo sounder with Ice Protection ETN050XG 50kHz 40m cable ETN200SXG 200kHz 40m cable ETN050BELX 50kHz 40m cable ETN200F...

Page 17: ...0 DB 2033 00 Clamp Unit DB 2031 00 Top Flange DB 2026 01 Extention Tube 0 5m DWG NO 1 4 2 2 2 1 17 16 14 13 15 1 11 08 10 12 18 1 06 1 QTY 01 IT Bottom Flange SB 07 DESCRIPTION 2 36 Spring Washer M8 DIN 127B A4 St steel 2 2 A4 St steel Screw M8 x 30 DIN 933 Material A4 St steel Screw M4 x 8 DIN 7991 30 32 O ring 139 29 x 3 53 Nitril NBR 70 shore 1 31 A4 St steel Spring Washer M16 DIN 127B 28 29 A4...

Page 18: ... vessel Turn off unit at power both Display and transceiver Mark the alignment of the sensor on the gate valve and sensor flange pole Lift the sensor into the gate valve and close the valve Grease the valves external moving parts When restarting Heat the areas containing display to allow condensation to evaporate Lift and inspect the sensor head or send diver Carefully clean away growth Redeploy t...