background image

4.

 

The unit is now ready to test. Turn on the appropriate power switch(es) pt 5. 
Press a button on the front panel. The unit will start and the display (with no 
data) will be displayed.    

Note: The factory default has brightness low and night picture and may need adjusting 
to be seen in bright sunlight. 
 

Mounting the Transceiver. 

 

LED A 
Power

 

1.

 

Mount the unit on a solid wall. (The 
unit weighs 17 kg). Ground the unit via 
the bolts or with a cable to the ships 
ground. Route power to the unit 
(mains/24DC or both, The unit needs at 
least 60W at peak.) 

2.

 

Turning on the power with no cabling 
will not damage the unit, LED A 
should light. 

(8-10mm bolts are needed to mount the unit to 
the wall, not supplied) 
 

Installing the Gate valve (See separate manuals for full 
details)  SB-100-Manual and DB-100-Manual. 

 

 
 

 
 
 
 

Reviews: