Check the GVP unit is off and the air supply closed.
•
Loosen the locking nut with an open end wrench (H.19)
(† 1 ig. 16)
while holding the injector and remove the cylinder
from the injector.
•
Once it is removed you can see the metering stop in the injector
(† 1 ig. 17)
•
Remove the metering stop
(† 1 ig. 18)
with a pliers
•
Put the selected metering stop for the new metering volume in the
cylinder. The side of the stop for the metering volume must point
towards the injector.
•
Put the O-ring Ø10×1
(† 2 ig. 19)
on the metering stop
(† 1 ig. 19)
•
Insert the cylinder head in the injector
•
Tighten the locking nut
C AUTION!
The lubrication system GVP must be disconnected from the
power supply and not under pressure when modifying the
metered volume. Therefore turn off the power supply and
depressurize the system.
C AUTION!
Lubricant might low away when removing the cylinder from the
injector.
Fig. 16
Fig. 17
Fig. 18
Fig. 19
1
1
1
2
1
21