14
Figure 2
(1)All emergency stop button reset.
(2)When the protective cover is not opened, the total power switch is closed, and
the starting switch of the control power switch A is opened, and the operation can
be carried out.
7.2.4 Power after the first boot
(1)After the power supply, turn on the power switch A. If the power indicator light
is normal, the connection is correct. Such as electricity without the power indicator,
should change the power supply to re open the power switch A, check the power indicator.
(2)Confirm the correct connection, set the thermostat B to the required value.
(3)After the actual temperature to reach the set temperature of ten minutes after
all the motor in order to start.
7.2.5 Shutdown:
(1)Switch off all motor switches.
(2)Switch off the control power switch A, cut off the control power supply.
(3)Turn off the main switch, the whole machine power off. Cut off the power.
7.2.6 Gas installation:
(1) before the installation, check the gas supply capacity of not less than 0.5m
/min 0.5-0.6Mpa fand air pressure.
(2)
were inserted into the trachea machine nozzle used on aerodynamic inlet triple
in ventilation.
Chapter 8
: Machine tool use and adjustment
This machine tool has passed the precise adjustment and the strict test before leaving
the factory, has not been related to the training or has not specially specially
specially specially to instruct not to be arbitrarily randomly to tune. In the process
of use, the user may need to adjust the machine according to the change of the material
specification. Such adjustments must be carried out by a specially trained
professional.