![Skanti TRP 9250 S Technical Manual Download Page 78](http://html1.mh-extra.com/html/skanti/trp-9250-s/trp-9250-s_technical-manual_1286673078.webp)
The AC supply leads are connected as indicated to the terminal block. Screened power supply
cable may be used as required by some administrations. The cable is fastened and the screen
connected by the cable clamp on the main chassis below the terminal block.
L
Live
N
Neutral
Protective earth
Recommende cable type: 3 x 1.5 mm2
The 24 V DC supply leads are connected to the Battery terminals located to the right of the
Connection Board. Cable screen is connected to the chassis by means of the cable clamp on the
main chassis below the terminals. The earth connection of the equipment will not cause the battery
to be earthed. Maximum possible peak voltage betweeen the battery terminals and earth is 100 V.
Note that fuses must be provided in the supply leads. A table on the previous page shows the
necessary cable cross sections and external fuse ratings.
POWER SUPPLY
INSTALLATION
TRP 9250 TECHNICAL MANUAL
3-11
Summary of Contents for TRP 9250 S
Page 1: ...TRP 9250 Series Radio Transceiver for MF HF Technical Manual ...
Page 3: ...INTRODUCTION 1 2 TRP 9250 TECHNICAL MANUAL ...
Page 13: ...OPERATION 2 OPERATION Table of Contents 2 2 TRP 9250 TECHNICAL MANUAL ...
Page 69: ...INSTALLATION 3 INSTALLATION Table of contents 3 2 TRP 9250 TECHNICAL MANUAL ...
Page 95: ...INSTALLATION 3 28 TRP 9250 TECHNICAL MANUAL ...
Page 133: ...DSC 9000 FRONT PANEL DSC OPERATION DSC 9000 FRONT PANEL 4 2 TRP 9250 TECHNICAL MANUAL ...
Page 203: ...DSC OPERATION 4 72 TRP 9250 TECHNICAL MANUAL ...
Page 205: ...DSC INSTALLATION 5 DSC INSTALLATION Table of Contents 5 2 TRP 9250 TECHNICAL MANUAL ...
Page 227: ...DSC INSTALLATION 5 24 TRP 9250 TECHNICAL MANUAL ...