SJE
®
13 SJE Panel Link
™
RTU User Manual
WIRING METHODS
When wiring the SJE Panel Link
™
panel, be sure to use liquid-tight conduit or strain relief fittings.
Liquid-tight
conduit fittings
Liquid-tight conduit
OR
CONDUIT OPTIONS
Use liquid tight fittings and conduit to run cables between the SJE Panel Link
™
and the
Lift Station control panel. Do not run conduit from the SJE Panel Link
™
to the wet well.
Conduit
TM