background image

 

8

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

9)

 

ATTENTION 

 

 

To adjust the group 1 is necessary, using the proper tools, loosen the nut 3. Now turn 
the sleeve 4 on the A direction if you want decrease the pressure on the ground in the 
direction  of  the  whhels  or  in  the  B  direction    if  you  want  to  increase.  Once  you  will 
have done the regulation, tighten the nut ring 3.   
To  maintain  always  efficient  the  group  1,  brush  some  grease  on  parts  1-2-3  
periodically (every 40/50 hours) and when you leave it unattended for long periods. 

 

Summary of Contents for 250.799

Page 1: ...DER KIT ASSEMBLY USE AND SPARE PARTS LIST DOUBLE ACTING CYLINDER KIT FOR MKE 10 12 PART NO 250 799 DOUBLE ACTING CYLINDER KIT FOR MKE 14 16 PART NO 250 800 DOUBLE ACTING CYLINDER KIT FOR MKE 18 20 PART NO 250 801 05 2015 ...

Page 2: ...the A points where the existing hose is fixed until the female end of the same is in the center of B machine s frame Now after having removed the existing screws lock at A points the hose 2 with the collars 3 and screws 4 In this stage do not tighten completely the collars 3 and the screws 4 Fix the rapid coupling 1 to the hose 2 It is recommended to put some Loctite to avoid oil leakage In this s...

Page 3: ... A points the hose 2 with the collars 3 and screws 4 In this stage do not tighten completely the collars 3 and the screws 4 Fix the rapid coupling 1 to the hose 2 It is recommended to put some Loctite to avoid oil leakage In this step you will use Item 1 1 rapid coupling NPT Item 2 1 hose 3 8 l 11250 443 male1 2 NPT female jic Item 3 18 hose collars ø18 ø0 71 Item 4 18 screws M8x60 0 31 x 2 36 Ass...

Page 4: ...u will use Item 1 1 rapid coupling NPT Item 2 1 hose 3 8 l 12950 510 male1 2 NPT female jic Item 3 18 hose collars ø18 ø0 71 Item 4 18 screws M8x60 0 31 x 2 36 4 DANGER See next page For all models Lay the hoses 1 following the way of the existing hoses A and bring the female ends of the same at the center of frame B Now join the hoses 1 and the hose 2 to the fitting 3 without tightening completel...

Page 5: ...when the machine s frame is enlarged Where it is necessary lock the hoses 1 with the clamps 8 Now see points 1 2 3 tighten completely the hose 2 In this step you will use Item 1 2 hose 3 8 l 2100 82 7 female jic eye 3 8 Item 2 see preceding steps Item 3 1 T fitting male jic Item 4 4 washer 3 8 Item 5 2 screws 3 8 Item 6 4 hose collars ø18 ø0 71 Item 4 8 screws M8x60 0 31 x 2 36 ...

Page 6: ...t be reused 6 DANGER The control group 1 will arrive already assembled from the manufacturer it is composed by bushing 2 the ring nut 3 and the outer bushing 4 The group 1 must be assembled on pipe 5 and cylinder 6 through the screw 7 and nut 8 In this step you will use Item 7 2 screws M8x60 0 31 x 2 36 Item 8 2 nuts M8 0 31 ...

Page 7: ...e starting one A there would be serious damages to the machine It can also be positioned on the initial hole A but we don t suggest it to avoid someone inadvertenly or mistakenly move the handle 1 on the holes subsequent to the first 8 DANGER For this operation please refer to the general manual of the machine Connect in a proper way the new hose A to an hydraulic double acting hitch B ...

Page 8: ...u want decrease the pressure on the ground in the direction of the whhels or in the B direction if you want to increase Once you will have done the regulation tighten the nut ring 3 To maintain always efficient the group 1 brush some grease on parts 1 2 3 periodically every 40 50 hours and when you leave it unattended for long periods ...

Page 9: ...9 SPARE PARTS LIST ...

Page 10: ...10 ...

Page 11: ... 901 SCREW M6x60 DIN 912 5 1 640 036 T FITTING MALE JIC 3 4 6 2 640 181 HOSE 3 8 L 2100 82 68 F JIC 3 4 EYE 3 8 7 10 620 039 HOSE CLAMP 8 4 620 452 WASHER ø3 8 BONDED 9 2 600 040 SCREW 3 8 10 2 250 830 BUSHING M45x1 5 11 2 630 535 RING NUT M45x1 5 12 2 250 831 RING M45x1 5 13 2 640 185 SCREW M8x60 DIN 931 14 2 600 076 NUT M8 DIN 980 1 250 799 COMPLETE KIT MKE 10 12 ...

Page 12: ...12 ...

Page 13: ...901 SCREW M6x60 DIN 912 5 1 640 036 T FITTING MALE JIC 3 4 6 2 640 181 HOSE 3 8 L 2100 82 68 F JIC 3 4 EYE 3 8 7 10 620 039 HOSE CLAMP 8 4 620 452 WASHER ø3 8 BONDED 9 2 600 040 SCREW 3 8 10 2 250 830 BUSHING M45x1 5 11 2 630 535 RING NUT M45x1 5 12 2 250 831 RING M45x1 5 13 2 640 185 SCREW M8x60 DIN 931 14 2 600 076 NUT M8 DIN 980 1 250 800 COMPLETE KIT MKE 14 16 ...

Page 14: ...14 ...

Page 15: ...0 901 SCREW M6x60 DIN 912 5 1 640 036 T FITTING MALE JIC 3 4 6 2 640 181 HOSE 3 8 L 2100 82 68 F JIC 3 4 EYE 3 8 7 10 620 039 HOSE CLAMP 8 4 620 452 WASHER ø3 8 BONDED 9 2 600 040 SCREW 3 8 10 2 250 830 BUSHING M45x1 5 11 2 630 535 RING NUT M45x1 5 12 2 250 831 RING M45x1 5 13 2 640 185 SCREW M8x60 DIN 931 14 2 600 076 NUT M8 DIN 980 1 250 801 COMPLETE KIT MKE 18 20 ...

Page 16: ...16 Zona Industriale Viale Grecia 8 06018 TRESTINA Perugia ITALY Tel 39 075 8540021 Telefax 39 075 8540523 e mail sitrex sitrex it www sitrex com ...

Reviews: