3
2)
DANGER
Lay the hose 2 along the drawbar following the A points where the existing hose is
fixed until the female end of the same is in the center of B machine’s frame. Now,
after having removed the existing screws, lock at A points the hose 2 with the
collars 3 and screws 4. In this stage, do not tighten completely the collars 3 and the
screws 4. Fix the rapid coupling 1 to the hose 2. It is recommended to put some
Loctite to avoid oil leakage.
In this step, you will use:
Item 1: 1 rapid coupling ½” NPT
Item 2: 1 hose 3/8” l. 11250- 443” male1/2” NPT female ¾” jic
Item 3: 18 hose collars ø18 – ø0.71”
Item 4: 18 screws M8x60 (0.31” x 2.36”)
Assembly sequence (MKE/14-16)