10
Section 6: DEBRIS SPACE
In accordance with BS 5871 part 2, minimum debris collection volumes are required
behind the installed appliance when used with the appropriate hotbox or convector
box.
CLAY/CEMENT LINES OR BLOCK FLUE WHICH IS NEW, UNUSED, OR PREVIOUSLY
ONLY USED WITH A GAS FIRE.
Appliance recessed depth + 20mm
UNLINED FLUE OR CHIMNEY WHICH HAS BEEN PREVIOUSLY USED FOR A SOLID
FUEL OR OIL BURNING APPLIANCE
Appliance recessed depth + 60mm
Section 7: INSTALLATION OF APPLIANCE
Always ensure that the gas supply is isolated before commencing installation of the appliance.
The fireplace opening and environment must be in compliance with specifications laid down in
the appropriate sections of these instructions.
Remove the appliance from its carton as described previously and stand on a dust sheet.
Place the coals, ceramics and fixings safely to one side.
If the burner from the assembly by removing the two screws at the base of the burner tray
and undoing the connecting nut to the isolation taps.
The tray is now free and may be lifted away from the base plate, lift free of the retaining clips
at the back of the burner tray.
If this is the Remote controlled version of the this fire then
care
is needed when removing
the burner not to damage the wiring system of the fire, you will need to remove the control
box, Heat Shield and battery holder placed at the back of the fire.
Diagram 3
NUT
ISOLATION
TAP
SCREWS
Summary of Contents for Streamline 3
Page 17: ...17 Step 3 Step 4 ...