background image

CHAP. 3 - RECEIVING THE MACHINE 

 

3.1 - SHIPPING THE MACHINE (see FIG. n°3) 

The machine leaves our warehouses correctly packaged, such a package consists 
of: 

a) an external box in robust cardboard and a wooden pallet; 

 

b) the machine; 

 

c) this manual;   

 

d) the CE compliance certificate. 

If requested/ordered: 
 

e) stand with sieve.  

 

FIG. n°3 - Package description 

b) 

   e) 

a) 

c) 

 

 

  d) 

3.2 - CHECKING THE PACKAGE UPON RECEIPT

 

When the package is received, if there is no external damage, open the package 
and check that all the material is inside 

(see FIG. n°3)

.  

If the package shows signs of mishandling, bumps or falls upon delivery, the 
shipping company must be made aware of the damage within 3 days of the 
delivery date indicated on the documents, and a detailed report must be written on 
the damage to the machine. 

Do not overturn the package!!

 When the package is 

being moved make sure that it is firmly held in the four fundamental points 
(keeping it parallel to the floor). 
 

3.3 - DISPOSING OF THE PACKAGE

 

The package components (cardboard, pallets, plastic and polyurethan foam strap) 
are produced like solid urban waste, therefore they can easily be disposed of. 
If the machine is installed in countries with particular norms, dispose of the 
packages according to the laws in force. 
 

CHAP. 4 - INSTALLATION

 

 

4.1 - MACHINE PLACEMENT

 

When choosing the plane the machine will be placed on the dimensions shown in  
Tab. 1 must be considered (based on the model), therefore the surfaces must be 
wide enough to hold it, and it must be well-levelled and dry.  
Prearrange a discharge tube (ø60 mm.) under the machine and a drain trap on the 
floor, or a floor grate to collect 
the water or other waste 
material.

 

Furthermore the machine must 
be placed as near as possible to 
a faucet (ø12 mm.), which 
enables the feeding tube to be 
easily and safely attached 

(see 

FIG. n°4)

.

 

Once the machine is placed 
proceed to blocking it by 
fastening it to the floor with the 
setscrews on the flanged feet 

(see FIG.)

. Furthermore the 

machine must be placed in an 
environment with a maximum 
humidity of  75%,  which is not 
salty and has a temperature 
b5°C and +25°C; in 
any case  in environments 

Fig. n°4 - Discharge diagram 

     Load ø12 

PPJ/LCJ/PCJ10                  
h.910 mm. 

Discharge 

    120 

Summary of Contents for PPJ20

Page 1: ...CABLE Periodically check the wear of the cable and call the ASSISTANCE CENTER to replace it CHAP 8 DISMANTLING 8 1 PUTTING IT OUT OF WORK If for some reason it is decided to put the machine out of work make sure that it cannot be used by anyone unplug the electrical connections 8 2 DISPOSAL Once it has been put out of work the machine can be eliminated To correctly di spose of the machine get info...

Page 2: ...starting this chapter it is important to point out that The line of professional PPJ LCJ is outfitted with normative measures for the e lectrical and mechanical protections both in the working phase and the cleaning and maintenance phases All the same RESIDUAL RISKS exist CEE 89 392 point 1 7 2 which cannot be totally eliminated they concern the danger of contu sions caused by inexpert contact wit...

Page 3: ... see FIG n 11 1 close the water faucet and put a big con tainer near the discharge outlet 2 to unload the material open the dischar ge door keeping it open with your right hand press the OUT and START pushbutton at the same time with your left hand the machine will start unloading the product by centrifu gal force 3 once the unloading is complete the ma chine will stop by releasing the pu shbutton...

Page 4: ... are not followed carefully if the machine surfaces are treated with inappropriate products inflammable corrosive or harmful substances 1 2 SAFETY DEVICES INSTALLED ON THE MACHINE The safety devices against risks of electrical nature conform with the norms EN 60335 1 EN 55014 and the directives 73 23 CEE 89 336 CEE while the mechanical safety devices conform with the directives 98 37 CEE The machi...

Page 5: ...3 DESCRIPTION OF THE MACHINE 1 3 1 General description The line of CED professional PPJ LCJs has been designed and manufactured by our company with the precise objective of guaranteeing maximum safety during use cleaning and maintenance maximum hygiene the result of the careful selection of materials which come into contact with foodstuffs and due to the elimination of sharp edges from the part wh...

Page 6: ... possibility of adding the sieve to the stand to collect waste CHAP 2 TECHNICAL DATA 2 1 DIMENSIONS WEIGHT CHARACTERISTICS 1 3 3 Machine makeup 14 15 3 1 2 5 7 9 4 8 10 12 13 6 11 11 4 3 ELECTRICAL DIAGRAMS 4 3 1 Diagram of the single phase electrical system FIG n 6 Mn electrical diagram FEED TENSION CHANGE DOOR MICROSWITCH COVER MICRO DISCHARGE PUSHBUTTON GREEN BLACK BLUE BLAK RED WHITE BLACK ON ...

Page 7: ...ton The direction of rotation of the cap seen from the discharge outlet must be counterclockwise if the direction of rotation is not exact invert two of the three feeding wires in the plug or outlet see FIG n 8 The three phase motor can run with a tension of either 230 V or 400V If not otherwise specified the connections are carried out for 400V to adapt to a three phase 230V network ask for assis...

Page 8: ...s cardboard pallets plastic and polyurethan foam strap are produced like solid urban waste therefore they can easily be disposed of If the machine is installed in countries with particular norms dispose of the packages according to the laws in force CHAP 4 INSTALLATION 4 1 MACHINE PLACEMENT When choosing the plane the machine will be placed on the dimensions shown in Tab 1 must be considered based...

Reviews: