32
USES
33
PANEL OPENING
It is possible to open the cover panel of the gre-
ase filters by pulling it gently as shown in fig. 1.
The panel is fixed by 4 magnets, there are also 4
safety cables to be released to completely remo-
ve the panel from the product (fig. 2).
It is recommended to install the product at a ma-
ximum distance of 2000 - 2100 mm from the floor
level.
Before proceeding with the installation of the ap-
pliance, check that all the components are not
damaged, otherwise contact the dealer and do
not proceed with installation.
Use an air outlet pipe that has the maximum leng-
th of no more than 5 meters.
- Limit the number of bends in the canalization
since each bends reduces the suction efficien-
cy equivalent to 1 linear meter. (for example if
n°2 90°bends are used the length of the ducting
should not exceed 3 meters).
- Avoid drastic changes of direction.
- Use a duct with a constant diameter of 150mm
over the entire length.
-Use a material approved by standards and re-
gulations.
Summary of Contents for SLT976
Page 2: ...2 2...
Page 3: ...3 3 2 4 5 3 6 1...
Page 4: ...4 8 10 11 9 4 7 12...
Page 5: ...5 5 13 16 17 14 15 18...
Page 6: ...6 6 20 21 19 22 24 23...
Page 7: ...7 7 25 28 26 27 30 29...
Page 8: ...8 8 31 32 33...
Page 9: ...9 HU TARTALOM Figyelmeztet sek Haszn lat Telep t s M k dtet s Karbantart s...
Page 30: ...30 CONTENTS Warnings Uses Installation Working Maintenance GB 31...
Page 45: ...45 46 10 In case of following error Go back to the home page TAP Claim Devices...