SIQENS Ecoport 800
Installation
Page 19 of 48
4.3.
Connecting the methanol supply
DANGER
Please observe the safety instructions for handling methanol
NOTICE
Make sure that the methanol supply line is protected against tearing and free from
bends
Do not position the QE Charge methanol cartridge or external tank above the level
of the Ecoport. Place the cartridge or tank with the opening facing upwards.
1.
Prepare the installation space
Guide the tank supply line of the Ecoport through
the prepared breakthrough (approx. Ø 100 mm).
2.
Place tank
Place the full cartridge in the desired position.
Make sure that the cartridge is upright and stands
on solid ground.
3.
Open the cartridge
Open the cap of the full cartridge using the barrel
wrench (this is included in the accessories of your
Ecoport) by turning it counterclockwise