© Copyright 2020 LBC Bakery Equipment 6 Rev G 10/2020
DIMENSIONS and UTILITY CONNECT POINTS (Part 2 of 2)
.
Drain Connections.
Connect 1/2” drain line to 1/2 NPT drain connector located at bottom right side of
proofer. Route drain line to a floor drain allowing a minimum 1” air gap between drain line outlet and
floor drain.
If the proofer is being used with an oven it is recommended that separate drain and water lines are
provided.
Electrical Connections
A 6 ft power supply cord with NEMA 5-15 plug is supplied with proofer. Proofer requires a dedicated
120V, 15A, 60 Hz, single phase supply with ground.
INSTALLATION and STARTUP CHECKLIST
.
Level appliance
It is important that installation site is level. If
needed, shim caster plates with washers to level
the appliance.
Connect appliance to
water supply
Ensure water supply meets specifications.
Damage caused by poor water quality will void
warranty.
Turn supply valve on
Check for leaks
Connect appliance to
power supply
Plug LMO-P cord into a NEMA 5-15 dedicated
outlet
Turn control on
Consult control instructions for operation
Validate proofer functions
Allow proofer to cycle on and off several times
Check temperature output
Check humidity output
Inspect drain connections for leaks
Ensure drain in not blocked
Proof product
If available, test proofing operation with
customer’s product.
Adjust heat and humidity settings as needed
Clean appliance
Clean all exterior surfaces with warm soapy water
and towel dry
Polish surfaces using an NSF approved stainless
steel polish
WARNING
ELECTRICAL AND GROUNDING CONNECTIONS MUST COMPLY
WITH THE APPLICABLE PORTIONS OF THE NATIONAL ELECTRICAL
CODE AND ALL STATE AND LOCAL CODES.