Sincro SK 225 Use And Maintenance Manual Download Page 24

24

ENGLISH

CAUTION!

 

if  the  bottom  speed  is  set  at  too  low  a 
frequency, the gen er a tor may be damaged. 
On  the  other  hand,  too  high  a  frequency 
can cause voltage drops with high loads.

Connecting  an  external  potentiometer  (5kOhm,  ½W)

remove  the  jumper  on  terminals  “

EXT  POT

”  and  wire  the 

potentiometer  to  the  free  terminals,  how ev er  make  sure 
that  it  is  set  at  its  maximum  resistance.  Turn  trimmer  “

V

” 

anticlockwise  to  its  limit.  Take  the  generating  set  to  its 
nominal  speed  and  adjust  the  potentiometer  until  the 
required voltage is obtained. 

If  on  load  voltage 

fl

 uctuations  are  experienced  adjust 

potentiometer  “

ST

”,  which  modulates  the  reaction  time  of 

the  regulator  to  external  inputs,  there by  eliminating  any 
instability in the alternator-load system.

6.4.5 Wiring diagrams for different circuits

In the appendix of this manual there are diagrams for any 
connections  other  than  the  factory  star-series  standard 
(unless otherwise specifi ed on order).

6.4.6 Initial start-up

Before starting up the generating set, check that all external 
con nec tions  are  in  order  and  that  the  protections  are  in 
place.

During  the  initial  start-up  pay  particular  attention  for  any 
unusual  noises  that  might  signal  an  incorrect  alignment 
between engine and generator.

!

WARNING!

Do  not  touch  the  generator  while  in 
operation and straight after the generating 
set  has  stopped,  since  certain  parts  may 
still be very hot.

Generators  are  rotating  electrical  machines  that  involve 
potentially  haz ard ous  live  or  moving  parts,  therefore  the 
following is strictly prohibited:

an improper use
removal of covers and disconnection of safeties.

!

WARNING!

The  lack  of  routine  check-ups  and  poor 
maintenance  can  cause  severe  damage  to 
persons and/or objects.

Due  to  these  inherent  hazards,  all  work  of  an  electrical 
or  mechanical  na ture  must  be  carried  out  by  qualifi ed 
specialists.


Summary of Contents for SK 225

Page 1: ...Manuale di Uso e Manutenzione Use and Maintenance Manual SK 225 0900242 REV 00 12 2009...

Page 2: ...iversi circuiti 10 6 4 6 Messa in marcia 10 7 ASSISTENZA E MANUTENZIONE 11 7 1 Controllo degli avvolgimenti e dello stato di isolamento 11 7 2 Controllo dei cuscinetti 11 7 3 Anomalie e rimedi 12 7 4...

Page 3: ...ntazione Usi non indicati in questa documentazione potrebbero essere fonte di danni al prodotto e fonte di pericolo La Sincro S r l declina qualsiasi responsabilit derivante dall uso improprio o diver...

Page 4: ...ortabile con cofanatura per fornitura di energia temporanea A bordo sottocoperta impiego marino previa omologazione Su veicolo commerciale trasporto su ruote refrigerazione etc Su rotaia energia ausil...

Page 5: ...ore al fine di eliminare eventuali instabilit di tensione che si dovessero manifestare Un fusibile protegge il regolatore e il generatore da eventuali sovraccarichi e o guasti Scheda AVR 5 SPECIFICHE...

Page 6: ...sostegno del motore generatore in modo da costituire una buona base per un esatto allineamento Tale telaio dovr esserevincolatoalbasamentomediantetamponiantivibranti Al fine di ridurre al minimo le o...

Page 7: ...raggio fare riferimento al punto 6 2 5 6 2 1 Montaggio forma IM B35 ATTENZIONE Prima del montaggio verificare che le sedi coniche di accoppiamento sia del generatore che del motore siano compatibili r...

Page 8: ...nessioni meccaniche si consiglia di utilizzare viti con classe di resistenza minima 8 8 Le coppie di serraggio sono riportate nella seguente tabella COPPIE DI SERRAGGIO Nm mat 8 8 Diametro di filettat...

Page 9: ...alersi degli schemi allegati al presente manuale AVVERTENZA Le eventuali modifiche al collegamento devono essere eseguite esclusivamente da personale qualificato 6 4 4 Regolazione scheda AVR AVVERTENZ...

Page 10: ...ollegamento stella serie normalmente eseguito in produzione a meno di specifiche diverse all atto dell ordine 6 4 6 Messa in marcia Prima dell avviamento del gruppo elettrogeno necessario verificare c...

Page 11: ...ti I cuscinetti sono sigillati ed esenti da manutenzione Durante la manutenzione controllare lo stato dei cuscinetti e verificare che non siano presenti perdite di grasso la durata dei cuscinetti dipe...

Page 12: ...chiesta Regolare la tensione con il potenziometro V dell AVR Settaggio sottovelocit non corretto Controllare e sistemare la sottovelocit con il potenziometro UF dell AVR Vedi 6 4 4 Regolazione della s...

Page 13: ...lungo la scarpa polare AVVERTENZA Quando viene reinserito il rotore l alternatore pu perdere il magnetismo residuo che permette l autoeccitazione Prima dell avviamento del gruppo risulta quindi necess...

Page 14: ...tto seguendo le istruzioni dei paragrafi 7 4 1 7 4 2 7 4 3 7 4 5 Riassemblaggio di componenti e gruppi di componenti Per l operazione di riassemblaggio compiere a ritroso le precedenti operazioni eseg...

Page 15: ...liente indipendentemente dalla concessione dell intervento in garanzia Curare che le macchine siano in ordine pulite Si raccomanda di restituire il materiale entro un imballo adeguato curando di prote...

Page 16: ...Wiring diagrams for different circuits 24 6 4 6 Initial start up 24 7 AFTERSALES ASSISTANCE AND MAINTENANCE 25 7 1 Control of windings and electrical insulation 25 7 2 Control of bearings 25 7 3 Trou...

Page 17: ...cted solely for the applications indicated in this manual Any use not specified in this manual may cause damage to the product and become a source of hazard Sincro S r l declines all liability arising...

Page 18: ...supplies Onboard below deck marine use after certification On commercial vehicles freight transport cold storage etc On rolling track auxiliary power On industrial vehicles earth handling hoisting etc...

Page 19: ...ND ELECTRICAL SPECIFICATIONS FOR COUPLING WITH ENGINE As an independent unit designed to be built into a electricity generating set it is impossible to apply all the signal decals on the generator dur...

Page 20: ...s established for a precise alignment This frame should be anchored to the base with antivibration plugs In order to minimise twist oscillations it is advisable to use a suitably sized flexible joint...

Page 21: ...35 CAUTION Before proceding with assembly check that the faces couplings both on generator and engine are compatible in order and perfectly clean Remove the protective grids 6 Fasten the shield 1 to t...

Page 22: ...ions provided in section 6 2 3 6 2 5 Tightening torques For mechanical connections it is recommended to use screws at least class 8 8 The tightening torques are shown in the following table TIGHTENING...

Page 23: ...ntacts are left bare it is important that this operation be carried out solely by qualified specialists in electrical plant maintenance To select the AVR settings access the control board after removi...

Page 24: ...ual there are diagrams for any connections other than the factory star series standard unless otherwise specified on order 6 4 6 Initial start up Before starting up the generating set check that all e...

Page 25: ...be blown through the alternator for at least 1 hour 7 2 Control of bearings The bearings are sealed and maintenance free During maintenance control the condition of the bearings and check that no gre...

Page 26: ...voltage is not set at desired value Adjust voltage with potentiometer V on the AVR Under frequency protecton not properly adjusted Check adjust the value of under frequency protection with the trimme...

Page 27: ...ositioned thealternator may loose the residual magnetism that enables it to self excite Before starting up the generating set the alternator will therefore have to be excited by applying a 6 12 volt c...

Page 28: ...everything following the instructions given in sections 7 4 1 7 4 2 7 4 3 7 4 5 Replacing components and component assemblies When assembling after changing a part repeat the above operations in rever...

Page 29: ...t regardless of whether warranty coverage will be claimed or not The client must make sure that the machines sent for repair are in good order clean and that the oil in the overgear system has been dr...

Page 30: ...30 SK225 Disegno esploso Exploded view Telimontagezeichung Vue eclat e Despiece...

Page 31: ...nique AVR BL4 Tarjeta electr nica AVR BL4 3008025 40 Scatola terminali Terminal box Verbindern Schachtel Bo te connecteurs Caja conectores Box 43 Morsetto isolatore M8 M8 insulator clamp Isolatorklemm...

Page 32: ...32 12 morsetti 12 wires 12 klemmen 12 bornes 12 bornes...

Page 33: ...1 U2 W2 V2 V1 W1 L3 W L2 V W2 U2 V2 W1 V1 U1 L1 U L2 V sensing 0 230 L3 W 3 3 L1 U N U1 U2 W2 V2 W1 V1 L3 W L2 V N W2 U2 V2 W1 V1 U1 L1 U L2 V sensing 0 230 L3 W 6 morsetti 6 wires 6 klemmen 6 bornes...

Page 34: ...34 12 morsetti 12 wires 12 klemmen 12 bornes 12 bornes 6 morsetti 6 wires 6 klemmen 6 bornes 6 bornes...

Page 35: ...ER ROTOR EXCITER AUX WINDING 400V 50Hz 400V 50Hz no load nominal load PHASE LINE e0 i0 en in mOhm Ohm Ohm mOhm Ohm V A V A SS 156 1 45 15 1 162 4 5 9 0 0 65 50 0 2 6 SM 120 1 61 15 1 162 4 3 MS 74 1 8...

Page 36: ...36...

Page 37: ...37...

Page 38: ...38...

Page 39: ...tive 2004 108 CE relative au rapprochement des l gislations des tats membres concernant la compatibilit lec tromagn tique La v rification de compatibilit a t effectu e conform ment aux normes suivante...

Page 40: ...222 www sogaenergyteam com sales sincro sogaenergyteam com Sincro srl si riserva il diritto di modificare i dati per aggiornare o migliorare i propri prodotti senza alcun preavviso Sincro srl reserves...

Reviews: