◆
Install Outdoor Unit
☆
Install Connect Pipe
●
Pipe can be led from 4 directions of right, rear right, left and rear left.
1. When routing pipe (wire) at right side or left side, cut off tailings of pipe left on chassis of main
unit in necessary (as shown in fig. 6).
(1) Cut off tailing 1 when only power cord is routed;
(2) Cut off tailings 1 and 2 (or 1,2 and 3) when connect pipe and power cord are routed;
2. Pull out pipe from bottom of case, wrap pipes, wires and drainage hose by strap then make
3. Hang the slots behind indoor unit onto the upper tabs of rear panel, then move the unit left
and right to check if it is firm enough (as shown in fig. 8).
4. Ensure the install height of indoor unit is 2m or more.
Gas side pipe
Wire
Liquid side
Heat insulator
Heat insulator
Drainage hose
Wrap by strap
Tailing 1
Tailing 3
Tailing 2
Fixing hook
Install
Install plate
Right
Rear right
Left
Rear left
Fig. 6
Fig. 7
Fig. 8
☆
Install Indoor Unit
1. Align the flare of connect pipe to the joint flare of corresponding valve.
2. Tighten nuts on connect pipe and then tighten it by spanner.
1. Take off handle at right side of outdoor unit.
2. Take off clamp, connect and fix the power connect
wire onto line bank. The wire connection should
3. Fix power connect wire by clamp. To cooling and
heating unit, fix signal control wire by clamp, and
then connect to corresponding connector.
4. Ensure wire had been fixed well.
5. Put on handle.
Handle
☆
Wire connection
them though wire hole (as shown in fig. 7).
plate
pipe
in the end
match that of indoor unit.
Blue
Black
Yellow-green
Signal control wire
(Only for cooling and heating unit)
Clamp
Power connect wire
-
17
-
Summary of Contents for ASH-09AQ
Page 1: ...USER S MANUAL ASH 09AQ ASH 13AQ ASH 18AQ QUEEN SERIES ...
Page 2: ......
Page 22: ......
Page 25: ......