Install Rear Plate
☆
Open Pipe Hole
1. Measure horizon by hanging line or horizontal measurement. Since drainage pipe hole is on
left, it is better to make left side lower.
2. Fix rear plate on wall by bolts.
3. Pull the rear panel by hand after
installation to see if it is firm enough.
Fig. 1
Left
Distance
The panel should be able to stand
Wall
150mm
φ65mm
Right
Shown in middle
Gradienter
830mm
180mm
120mm
284mm
(Rear pipe hole)
the weight of an adult (60kg) and
Wall
Distance
φ65mm
(Rear pipe hole)
or more
150mm
or more
the weight should be evenly shared
1. Drill a hole outward at a slant after pipe hole is determined as
shown in fig.1 (
Ф
65).
rats in the space, put on wall pipe.
Indoor Outdoor
Wall pipe
Sealing clay
Ø
65
◆
Install of Indoor Unit
☆
Install Drainage Hose
1. Drainage hose must be placed at a downward slant
for smooth drainage.
end by water.
3. The indoor part of prolonged hose should be wrapped
Wrenched
Bent
Don't flood it
☆
Install Connect Pipe
1. Connect the connect pipe with 2 leading pipes of indoor unit, then tighten joint nuts on connect pipe.
2. Tighten nuts on connect pipe forcibly, and then tighten it by spanner.
Note: Too great of torque would damage nuts.
Refer the following list for tighten torque.
Note: Connect the connect pipe with indoor unit first and then outdoor unit; bend and place of
pipe should be careful to prevent damaging the pipe; joint nut should not tighten too much
Hex nuts
Tighten Torque (N
·
m)
Ф6
Ф
9.5
Ф
12
31~35
15~20
50~55
by each screw.
to wall
side
to wall
side
2. In order to protect pipe and cable from being damaged and avoid
2. Don't wrench, bend or heave the hose or flood its
by heat insulating material.
Pipe of indoor unit
Nut
Pipe
Spanner
Wrench torque
or it would cause leakage.
in water
-
15
-
Summary of Contents for ASH-09AQ
Page 1: ...USER S MANUAL ASH 09AQ ASH 13AQ ASH 18AQ QUEEN SERIES ...
Page 2: ......
Page 22: ......
Page 25: ......