12
ASSEMBLY PROCEDURES
1. Assemble the wheel assembly to the bottom
plate. Fix the wheel assembly to the bottom
plate using 4pcs bolt M6X12 and 4pcs flange
nut M6.
- 8 -
ASSEMBLY PROCEDURES
Hardware Used
EE
FF
II
1
1. Assemble the wheel assembly to the
bottom plate. Fix the wheel assembly to the
bottom plate using 4pcs bolt M6X12 and 4pcs
flange nut
M6.
x 4
x 4
Wrench
x 1
M
J
K
DD
GG
OO
EE
FF
Bolt M6 X 12
M6 Flange nut
Hardware Used
2
2-1
.
Unscrew the switch button, load small
battery, tighten the switch button.
2-2. Insert the pins of the base to the holes of
lower support, press to secure the pins. Using
4pcs screw M5X12 to secure the lower support
and base.
Insert the pins of the control box assy to the
holes of upper support, press to secure the
pins. Using 4pcs screw
3/16” screw
to secure
the upper support and control box assy.
GG
JJ
x 4
Philips
screwdriver
x 1
Screw M5 X 12
DD
x 4
3/16” Screw
AA Battery (1.5 V)
- 8 -
ASSEMBLY PROCEDURES
Hardware Used
EE
FF
II
1
1. Assemble the wheel assembly to the
bottom plate. Fix the wheel assembly to the
bottom plate using 4pcs bolt M6X12 and 4pcs
flange nut
M6.
x 4
x 4
Wrench
x 1
M
J
K
DD
GG
OO
EE
FF
Bolt M6 X 12
M6 Flange nut
Hardware Used
2
2-1
.
Unscrew the switch button, load small
battery, tighten the switch button.
2-2. Insert the pins of the base to the holes of
lower support, press to secure the pins. Using
4pcs screw M5X12 to secure the lower support
and base.
Insert the pins of the control box assy to the
holes of upper support, press to secure the
pins. Using 4pcs screw
3/16” screw
to secure
the upper support and control box assy.
GG
JJ
x 4
Philips
screwdriver
x 1
Screw M5 X 12
DD
x 4
3/16” Screw
AA Battery (1.5 V)
Hardware Used
Bolt M6 X 12
x 4
M6 Flange nut
x 4
Wrench
x 1
1
- 8 -
ASSEMBLY PROCEDURES
Hardware Used
EE
FF
II
1
1. Assemble the wheel assembly to the
bottom plate. Fix the wheel assembly to the
bottom plate using 4pcs bolt M6X12 and 4pcs
flange nut
M6.
x 4
x 4
Wrench
x 1
M
J
K
DD
GG
OO
EE
FF
Bolt M6 X 12
M6 Flange nut
Hardware Used
2
2-1
.
Unscrew the switch button, load small
battery, tighten the switch button.
2-2. Insert the pins of the base to the holes of
lower support, press to secure the pins. Using
4pcs screw M5X12 to secure the lower support
and base.
Insert the pins of the control box assy to the
holes of upper support, press to secure the
pins. Using 4pcs screw
3/16” screw
to secure
the upper support and control box assy.
GG
JJ
x 4
Philips
screwdriver
x 1
Screw M5 X 12
DD
x 4
3/16” Screw
AA Battery (1.5 V)
2
AA Battery (1.5 V)
2.1 Unscrew the switch button, load the small
battery, tighten the switch button.
2.2 Insert the pins of the base to the holes of
lower support, press to secure the pins.
Using 4pcs screw M5X12 to secure the lower
support and base.
Insert the pins of the control box assy to the
holes of upper support, press to secure the
pins. Using 4pcs screw 3/16” screw to secure
the upper support and control box assy.
- 8 -
ASSEMBLY PROCEDURES
Hardware Used
EE
FF
II
1
1. Assemble the wheel assembly to the
bottom plate. Fix the wheel assembly to the
bottom plate using 4pcs bolt M6X12 and 4pcs
flange nut
M6.
x 4
x 4
Wrench
x 1
M
J
K
DD
GG
OO
EE
FF
Bolt M6 X 12
M6 Flange nut
Hardware Used
2
2-1
.
Unscrew the switch button, load small
battery, tighten the switch button.
2-2. Insert the pins of the base to the holes of
lower support, press to secure the pins. Using
4pcs screw M5X12 to secure the lower support
and base.
Insert the pins of the control box assy to the
holes of upper support, press to secure the
pins. Using 4pcs screw
3/16” screw
to secure
the upper support and control box assy.
GG
JJ
x 4
Philips
screwdriver
x 1
Screw M5 X 12
DD
x 4
3/16” Screw
AA Battery (1.5 V)
Hardware Used
Screw M5 X 12
x 4
3/16” Screw
x 4
Philips
screwdriver
x 1
Pyramid Gas Patio Heater_IM_Wowcher_A4.indd 12
Pyramid Gas Patio Heater_IM_Wowcher_A4.indd 12
12/05/2021 13:15
12/05/2021 13:15