TABLE OF CONTENTS
Specifications and performance
Handling, transportation and lifting
Procedure for getting on and off the prime mover
.............................................................................. 19
Hydraulic connection of the standard machine with 3-line hydraulic system to the prime mover
Hydraulic connection of the standard machine with 5-line hydraulic system to the prime mover
Hydraulic disconnection of the standard machine with 3- or 5-line hydraulic system from the prime
Disconnecting the machine from the prime mover
.............................................................................. 25
Setting the zero position for planing depth adjustment
....................................................................... 27
Cutter drum removal and refitting
Mechanical floating tilt device with spring jack
.................................................................................... 29
Side shift operation on the standard machine with 3-line hydraulic system
....................................... 32
Stopping the machine in normal conditions
........................................................................................ 35
Tool integrity assessment (teeth)
Structural integrity assessment
Summary of Contents for PL 4520
Page 14: ...14...
Page 60: ...60 IMPORTER...