Installation Instructions. 

1.  Dig the hole for the basin and the sub-base. The hole 

must be deep enough so the top of the basin is flush with 

the finished floor.

NOTICE: The sub-base should include 4” of sand or  

gravel. The maximum diameter of rock should be 1/2”; 3/4” 

maximum diameter pea gravel is recommended.

2.  Level the sub-base out until it is smooth. Sharp rock can 

damage the basin.

3.  Reach into the inlet hole to retrieve the hardware kit. 

Locate the cord grommet in the hardware kit.

4.  Reach into the inlet hole again to pull the power cords 

up through the cord grommet hole in the cover. Press 

the cords into the cord grommet and install the grommet 

in the cover.

5.  Locate the inlet hub in the hardware kit, and snap it into 

the inlet hole.

6.  Install the basin on top of the sub-base.

7.  Insert a 4” inlet pipe through the inlet hub. Insert it 2” 

into the basin. Dish soap can be used to lubricate the 

inlet hub. If necessary, file the sharp edges of the pipe to 

prevent damage to the hub.

NOTICE: The inlet pipe should pitch down to the basin 

inlet at 1/4” per foot. This will cause the water to run into 

the basin.

8.  Backfill around the basin with crushed rock, with a 

maximum diameter of 1/2”, or use pea gravel.

9.  Install a 1-1/2” discharge pipe into the 1-1/2” discharge 

flange. 

10.  Install a 2” vent pipe into the vent flange. The vent pipe 

must go through the roof of the building or it can be 

connected to an existing vent pipe. The sump basin 

must be vented.

NOTICE: Proper ventilation is needed to prevent 

negative basin pressure and to provide air within the 

basin.

11.  Install a 1-1/2” check valve in the discharge pipe. Make 

certain the flow indicating arrow points away from the 

pump. This check valve will keep the water from running 

back into the basin when the pump is not running.

NOTICE: To prevent pump contamination, clear basin  

of any debris during or after installation.

12.  Plug the pump into a properly grounded outlet.

13.   Check the operation by filling the basin with water and 

observing pump operation through one complete cycle. 

Make sure no parts of the assembly interfere with the float.

OPERATION

Failure to make this operational check may 

lead to improper operation, premature failure, and flooding.

NOTICE: The shaft seal depends on water for lubrication 

and cooling. Do not operate the pump unless it is submerged 

in water as the seal may be damaged if allowed to run dry. 

Allowing the pump to run dry will void the warranty.

An automatic overload protector in the motor will protect 

the motor from burning out due to overheating/overloading. 

When the motor cools down, the overload protector will 

automatically reset and start the motor.

If the overload trips frequently, check for the cause. It could 

be a stuck impeller, wrong/low voltage, or an electrical failure 

in the motor. If an electrical failure in the motor is suspected, 

have it serviced by a competent repairman.

The pump is permanently lubricated. No oiling or greasing is 

required.

NOTICE: The pump will not remove all water. For extended 

operation, water depth must be at least 5” (13 cm) to prevent 

motor overheating.

Airlocks

When a pump airlocks, it runs but does not move any water. 

An airlock will cause the pump to overheat and fail. The 

discharge pipe is plumbed with a predrilled anti-airlock hole. 

Leakage from the anti-airlock hole is normal during pump 

operation.

Float Switch – Operational Check

1.  Fill the sump with the correct amount of water to check 

the operation and tightness of the connections. During 

the first automatic cycle, it may take 30 seconds or more 

before the pump is primed and pumping. The pump will 

start as indicated in the “Pump, Motor, Switch and Cord 

Specifications” table on Page 2.

2.  Check the turn-off position. The pump will stop 

approximately as indicated in the “Pump, Motor, Switch 

and Cord Specifications”.

3.  If the pump does not operate, check the electrical service.

3

For parts or assistance, call Simer Customer Service at 

1-800-468-7867 / 1-800-546-7867

5596 0407

4" Inlet Pipe

Slope @ 1/4"

Per Foot

4" Snap-in 

Inlet Hub

Cord Grommet

Discharge 

Flange

Vent 

Flange

Floor

1-1/2" Discharge

Pipe

Vent Pipe – Extend vent 

through roof or connect 

to existing vent. 

Plug the Float Switch

into a Properly 

Grounded Outlet.

Check Valve 

Purchase check valve and inlet, vent 

and discharge pipes locally. 

Figure 1 – Typical Installation

Summary of Contents for 3985C

Page 1: ...ll void the warranty 8 The pump normally runs hot To avoid burns when servicing pump allow it to cool for 20 minutes after shut down before handling it 9 The pump is permanently lubricated No oiling o...

Page 2: ...shock the power cord is a three wire conductor and includes a 3 prong grounded plug Plug the pump into a 3 wire grounded grounding type receptacle Connect the pump according to the NEC or CEC and loca...

Page 3: ...of the assembly interfere with the float Operation Failure to make this operational check may lead to improper operation premature failure and flooding NOTICE The shaft seal depends on water for lubr...

Page 4: ...open the pump further than removing the suction housing The pump motor housing contains a special lubricating oil which should be kept clean and free of water at all times The sump basin and cover pu...

Page 5: ...ff of basin For parts or assistance call Simer Customer Service at 1 800 468 7867 1 800 546 7867 Key No Part Description Qty 3985C 1A Basin Cover Assembly Includes Nos 1 8 1 PW73 65P 1 Basin Cover 1 2...

Page 6: ...fore handling pump or motor Check to be sure you have electrical power Check that water level in basin is high enough to activate switch or controller Check to be sure that the anti airlock hole in th...

Page 7: ...applications Sewage Pumps DO NOT return a sewage pump that has been installed to your retail store Contact SIMER Customer Service Sewage pumps that have seen service and been removed carry a contamin...

Page 8: ...8 For parts or assistance call Simer Customer Service at 1 800 468 7867 1 800 546 7867...

Page 9: ...t de causer des blessures la personne qui la manip ulerait de plus cette pratique annule la garantie 8 Normalement la pompe est extr mement chaude lorsqu elle fonc tionne Pour ne pas se br ler si on d...

Page 10: ...s cor dons lectriques Risque de secousses lectriques et d incendies S assurer que les renseignements indiqu s dans cette Notice concernant l alimentation lectrique tension hertz phase correspondent ex...

Page 11: ...sant le col lecteur d eau et en observant le fonctionnement de la pompe sur un cycle complet S assurer que rien ne g ne le fonctionnement de l interrupteur 11 Pour le service des pi ces ou d assistanc...

Page 12: ...ons du couvercle du collecteur et l aide de ses poign es sortir la pompe du collecteur NE D MONTER RIEN D AUTRE QUE le carter d aspiration de la pompe Le carter du moteur de la pompe contient une huil...

Page 13: ...ntilation de 2 pouces 1 4 Rondelle plate 8 5 Boulon du collecteur 8 6 Bride de refoulement de 1 1 2 pouce 1 7 Bague d tanch it des cordons lectriques 1 8 Joint du couvercle 1 PW73 71 9 Bague d tanch i...

Page 14: ...haut pour actionner l interrupteur flotteur ou le contr leur 4 S assurer que le trou d air perc dans le tuyau de refoulement de la pompe n est pas bouch 5 S assurer que l aspiration de la pompe l imp...

Page 15: ...a t install e au d taillant Communiquer avec le service la client le de SIMER Les pompes d eaux d gout qui ont t utilis es puis retir es pr sentent un risque de contamination En cas de d faillance de...

Page 16: ...16 Pour le service des pi ces ou d assistance appeler le service la client le Simer au 1 800 468 7867 1 800 546 7867...

Page 17: ...ant a 8 La bomba generalmente est caliente durante su funcionamien to Para evitar quemaduras cuando se repare la bomba deje que se enfr e por 20 minutos despu s de haberla apagado y antes de manipular...

Page 18: ...e corriente el ctrica de la instalaci n Instale la bomba conforme a todas las normas el ctricas que correspondan AVISO Se necesita una ventilaci n adecuada para impedir una pre si n negativa en el com...

Page 19: ...ador Si se hace caso omiso a esta verificaci n existe el peligro de que ocurra un funcionamiento incorrecto una falla prematura e inundaci n 19 Por repuestos o ayuda llame al Departamento de Atenci n...

Page 20: ...omento Es necesario proteger el compartimiento de recogida y la cubierta la bomba y las tuber as en caso de temperaturas heladas Si existe el peligro de que haya temperaturas heladas se deber drenar l...

Page 21: ...e refuerzo del cord n 1 8 Aro de estanqueidad 1 PW73 71 9 Manguito de admisi n a presi n 1 10 Compartimiento de recogida 1 11 Bomba de sumidero 1 2975 REP 12 Tubo de descarga 1 U37 690P PIEZAS DE REPA...

Page 22: ...activar el interruptor o el control 4 Verificar que el orificio de ventilaci n anti bolsas de aire en la descarga de la bomba no est obturado 5 Verificar que no haya bloqueo en la admisi n de la bomba...

Page 23: ...comerciales o de alquiler Bombas cloacales NO devuelva una bomba cloacal que se haya instalado a su tienda minorista Comun quese con el Departamento de Atenci n al Cliente de SIMER Las bombas cloacale...

Page 24: ...24 Por repuestos o ayuda llame al Departamento de Atenci n al Cliente de Simer 1 800 468 7867 1 800 546 7867...

Reviews: