background image

CONTENTS

1

DESCRIPTION OF THE BOILER

 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 82

2

INSTALLATION

 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 84

3

CHARACTERISTICS

 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 93

4

USE AND MAINTENANCE

 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 96

INSTALLER INSTRUCTIONS

IMPORTANT

When carrying out commissioning of the boiler, you are highly recommended to perform the following checks:

– Make sure that there are no liquids or inflammable materials in the immediate vicinity of the boiler.

– Make sure that the electrical connections have been made correctly and that the earth wire is connected to a

good earthing system.

– Open the gas tap and check the soundness of the connections, including that of the burner.

– Make sure that the boiler is set for operation for the type of gas supplied.

– Check  that  the  flue  pipe  for  the  outlet  of  the  products  of  the  combustion  is  unobstructed  and  has  been  pro-

perly installed.

– Make sure that any shutoff valves are open.

– Make sure that the system is charged with water and is thoroughly vented.

– Check that the circulating pump is not locked (CAUTION: Remember to release the pump coupled with the con-

trol panel, if necessary, to protect the electronic control card).

– Purge the system, bleeding off the air present in the gas pipe by operating the pressure relief valve on the gas

valve inlet.

– Check that the syphened drip is fully filled with water. If necessary, fill it via the special opening.

PL

ANET 

DEWY 

30BFR

EN

GLISH

FONDERIE SIME S.p.A.

of Via Garbo 27 - Legnago (VR) - Italy declares that its hot water boilers, which bear the CE mark under

Gas Directive 90/396/CEE and are fitted with a safety thermostat calibrated to a maximum of 110°C, 

are not subject

to appli-

cation of PED Directive 97/23/CEE as they meet the requirements of article 1 paragraph 3.6 of the Directive.

Summary of Contents for PLANET DEWY 30 BFR

Page 1: ...is unobstructed and has been pro perly installed Make sure that any shutoff valves are open Make sure that the system is charged with water and is thoroughly vented Check that the circulating pump is...

Page 2: ...H return 3 4 M C H flow 3 4 G Gas connection 3 4 C1 System filling optional 1 2 S3 Condensation outlet 25 1 3 TECHNICAL FEATURES 30 BFR Heat output Nominal 80 60 C kW kcal h 28 3 24 300 Minimum 80 60...

Page 3: ...ixing jig 19 90 C limit stat 20 Condensation water trap 21 Gas rate adjuster 22 System filling optional 23 Aqua Guard 24 Non return valve 1 5 MAIN COMPONENTS Fig 3 KEY 1 Control panel 2 Gas rate adjus...

Page 4: ...e data plate is sticked inside the front panel it contains all the technical data identifying the boiler and the type of gas for which the boiler is arranged 2 3 1 Connection of condensation water tra...

Page 5: ...ow eaves 300 D below balcony 1 300 E from adjacent window 400 F from adjacent ventilation opening 600 G from horizontal or vertical soil or drain pipes 2 300 H from corner of building 300 I from reces...

Page 6: ...on calculation in that the sum of the head losses of the single fittings is less than 15 5 mm H2O Inlet Outlet 7 m horizontal pipe 80 x 0 20 1 40 7 m horizontal pipe 80 x 0 30 2 10 n 2 90 elbows 80 x...

Page 7: ...eed 15 5 mm H2O When calculating the lengths of pipe take into account the parameters given in the Table 2 2 8 60 PIPING SYSTEM A special kit allows to separate smoke outlet and air intake pipes The 8...

Page 8: ...cables of section 0 5 mm2 First of all assemble and wire the socket 2 then insert the equipment which will start up as soon as it receives current To gain access to connector 3 remove the control pan...

Page 9: ...electrode ER Sensing electrode TS 100 C safety stat V Fan TPA Water pressure transducer P Pump SE External sensor optional TA Room stat SM C H sensor blue TR Transformer 230 24V FL Flowmeter CR Logic...

Page 10: ...rough a window contact Anti bacterial 2 10 1 Installation The unit must be installed in the main living room For installation follow the assembly instructions inserted in the package At this point wit...

Page 11: ...nute of the prescribed delivery temperature value sent in C is limited to the imposed value With the activation of the adaptation the pre set value transmitted to the boiler regulator is adapted to th...

Page 12: ...o par metro 64 1 0 activa s a sonda interna 0 externa 100 interna 50 valor m dio da sonda externa interna 100 activa s a sonda externa Para a regula o ambiente e a visualiza o utilizada a mistura pro...

Page 13: ...egulated so as to obtain a pressure of approx 3 mbar at the burner for methane gas and 7 mbar for propane gas G31 To increase pressure turn the trimmer clockwise to reduce pres sure turn the trimmer c...

Page 14: ...up There could have a break in the wire of the sensing electrode or the electrode itself is touching earth the electrode is worn out and needs replacing The con trol box is defective When there is a...

Page 15: ...function of the flow in graph in fig 21 3 7 MAINS ELECTRICITY CONNECTION Use a separate electricity supply to con nect the room stats and relative zone val ves or pumps The micro or relay contact con...

Page 16: ...2 Gas valve 3 Mixer intake 4 Ventilator intake 5 Nozzle 6 Fan 7 Air gas mixer 8 Air pressure switch 9 Digital pressure gauge Fig 24 0 30 20 10 p aria mm H2O Potenza termica kW 25 20 10 15 50 40 60 5 3...

Page 17: ...G31 boilers it is a good idea to check that the position of the GPL bridge on the control board is correct Diaphragm code 6028640 Drawing 7 is assembled on the Dewy 25 model functioning on PROPANE G3...

Page 18: ...sliding them out of their slots 4 6 CLEANING AND MAINTENANCE Preventive maintenance and checking of efficient operation of equipment and safety devices must be carried out exclusively by authorized te...

Page 19: ...ing of the water C H TEMPERATURE ADJUSTMENT fig 2 The C H temperature can be adjusted by turning the knob of the C H potentiometer The set temperature is indicated on the red led scale from 35 80 C an...

Page 20: ...out occurs again call local authorised Service Centre for technical assistance Other anomalies fig 6 When one of the red 40 80 C leds start flashing switch off the boiler and then try to ignite again...

Page 21: ...utton automatic operation 4 Operating mode button manual operation 5 Operating mode button availability 6 Cover with instruction compartment 7 Temperature knob 8 Presence button Fig 8 KEY 1 Display ti...

Page 22: ...l lowing list of items one after the other are displayed The thermo feeler continues to function independently of the display Day hour room temperature External temperature Hot water service temperatu...

Page 23: ...ity boiler unit temperature desired for hot water service at reduced level To have access to the reduced hot water service temperature parameter press the and keys at the same time for at least 5 seco...

Page 24: ...rature set in parameter 3 1 standard Hot water according to the daily heating programme In the comfort periods of the heating the temperature of the boiler unit is regulated at the value set via para...

Page 25: ...of the heating characteristics curve When the room temperature set is not reached choose the gradient indicated in point 2 9 3 Display of the current boiler temperature Display of the current power of...

Page 26: ...fficient water pressure Reset operation using the boiler charge valve fig 4 Plant overpressure Call an authorised Service Centre Safety thermostat trips Call an authorised Service Centre Fan air press...

Reviews: