CONTENTS
1
DESCRIPTION OF THE BOILER
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 86
2
INSTALLATION
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 88
3
CHARACTERISTICS
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 97
4
USE AND MAINTENANCE
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 100
INSTALLER INSTRUCTIONS
IMPORTANT
When carrying out commissioning of the boiler, you are highly recommended to perform the following checks:
– Make sure that there are no liquids or inflammable materials in the immediate vicinity of the boiler.
– Make sure that the electrical connections have been made correctly and that the earth wire is connected to a good
earthing system.
– Open the gas cock and check the soundness of the connections, including that of the burner.
– Make sure that the boiler is set for operation for the type of gas supplied.
– Check that the flue pipe for the outlet of the products of the combustion is unobstructed and/or has been properly
installed.
– Make sure that any shutoff valves are open.
– Make sure that the system is charged with water and is thoroughly vented.
– Check that the circulating pump is not locked (CAUTION: Remember to release the pump coupled with the control
panel, if necessary, to protect the electronic control card).
– Purge the air present in the gas pipe by operating the pressure relief valve on the gas valve inlet.
EN
GLISH
FONDERIE SIME S.p.A.
of Via Garbo 27 - Legnago (VR) - Italy declares that its hot water boilers, which bear the CE mark under
Gas Directive 90/396/CEE and are fitted with a safety thermostat calibrated to a maximum of 110°C,
are not subject
to appli-
cation of PED Directive 97/23/CEE as they meet the requirements of article 1 paragraph 3.6 of the Directive.
Summary of Contents for PLANET 25/60 BF
Page 1: ...P l a n e t 25 60BF 30 60BF IT ES PT GB RO...
Page 145: ...DESCHIDE Led verde 33...
Page 156: ......
Page 159: ......