30
5 INSTALLATION
m
CAUTION
The appliance must only be installed by the
Sime
Technical Service or by qualified professionals
who
MUST wear
suitable protective safety equipment.
5.1
Receiving the product
Murelle Revolution 25
is delivered in a single unit protected by
cardboard packaging.
Fig. 48
The plastic bag found inside the packaging contains the
following:
– Installation, use and maintenance manual
– Certificate of warranty
– Hydrostatic test certificate
– System booklet
– External sensor
– Main control panel (remote)
– Bag with expansion plugs
– Boiler and heat pump energy labels
– Anti-vibration and spacer panels
– Paper template for boiler installation.
d
IT IS FORBIDDEN
Do not leave packaging material around or near
children since it could be dangerous. Dispose of it as
prescribed by legislation in force.
5.2
Dimensions and weight
Description
Murelle Revolution 25
W (mm)
600
D (mm)
391
H (mm)
900
H1 (mm)
82,5
H2 (mm)
71
Weight (kg)
103
H1
H
H2
L
P
Fig. 49
5.3
Handling
During transportation, the boiler must be kept in a vertical
position, and knocks against walls or hard surfaces should be
avoided.
d
IT IS FORBIDDEN
Position the appliance horizontally or on its side.
YES
NO
NO
Fig. 50