Commissioning Checklist for Murelle HE 110 R Single Boilers and Boilers in Cascade
This checklist is for guidance only, and is not a full installaon
safety chec
k
A
dd
ress
Commisioning e
t
a
D
r
e
e
ni
g
n
E
Signature
All
S
ystems
Has t
h
e system
b
een
fl
us
h
e
d
an
d
c
leane
d
i
n accor
d
ance w
it
h
BS7593 an
d
manu
factureres recommen
d
at
ions
?
YES
What system cleanser was used?
What inhibiter was used?
Q
uanty
Litres
.
12345678
Sasfactory
visual check of flue Y/N
Flue within allowable length and correctly terminated Y/N
Confirm Tightness of installaon
pipework downstream of Isolang
valve
using leak detecon
fluid
Y/N
Check ghtness
of all valves Y/N
Carryout ignion
test of boiler with gas isolated
to ensure boiler fails safe Y/N
Turn on gas supply to boiler and isolate main burner(disconnect gas valve)
and ensure boiler goes to lockout Y/N
Reset boiler lockout and retry, ensuring boiler again locks out Y/N
Reconnect gas valve, reset boiler lockout, and ensure boiler lights and is stable Y/N
Test safety devices Y/N
Safety stat(TS) - Disconnect - the boiler locks out Y/N
Flue analysis
Boiler 1
B
oiler 2
B
oiler 3
B
oiler 4
B
oiler 5
B
oiler 6
B
oiler 7
B
oiler 8
Boiler Output
Min
Max
Min
M
ax
Min
M
ax
Min
M
ax
Min
Max
Min
Max
Min
M
ax
Min
M
ax
CO ppm
CO2 %
Rao
Boiler size
Serial Number
Completed By
Date