–  refit the assembly by carrying out the same operations for 

removal but in the reverse order and tighten the screws (9) 

of the door to the combustion chamber

–  mount the nozzle (16) back on and adjust it so that the flared 

part faces downwards, as shown in the figure

17

Fig. 50

–  reconnect the connections to the fan and the electrode.

8.4 

Checks

8.4.1  Checking the flue

Check that the flue is undamaged and complete.

8.4.2  Checking the expansion vessel pressure

It is recommended that the expansion vessel on the water side 

is drained and that the prefilling pressure is not less than 

bar

. If this is not the case, pressurize it to the correct value 

(see section "Expansion vessel").

 

Once the checks described above have been completed:

–  refill the boiler as described in section "SYSTEM Filling"

–  check that the siphon has been filled correctly

–  Start the boiler, activate the "Chimney sweep function" and 

carry out combustion analysis as detailed in Appendix 2

–  refit the front panel securing it with the two screws which 

were removed previously.

8.5 

Circuit Board Replacement

Should the circuit board be replace, the engineer 

MUST set 

the parameters

 as indicated in this table and in the sequence 

shown.

Type No. Description

Setting for 

MIA-30

tS

0.1 Index showing boiler power in kW

1 = 30

1

tS

0.2

Hydraulic configuration

0 = combi

1 = system

2 = N/A

3 = N/A

4=instant with solar power input

5 = open vent

0

tS

0.3 Gas Type Configuration

0 = G20; 1 = G31

0 or 1

To enter "Parameter setting and display" refer to the indica-

tions provided in the specific section.

Once the parameters in the table have been set, you must car-

ry out the entire phase  of "Automatic self-calibrating proce-

dure" described in the specific section.

If the 

gas valve

 and/or the 

ignition/detection electrode

, and/or 

the 

burner

, and/or the 

fan

 are replaced, the engineer must still 

carry out the entire phase of "Automatic self-calibrating pro-

cedure" described in the specific section.

8.6 

Malfunction codes and possible solutions

 

LIST OF MALFUNCTION/FAULT ALARMS

Type No. Fault

Solution

AL

01 Smoke thermostat

- Contact the Technical 

Assistance Centre

AL

02 Low water pressure in 

system

- Restore pressure

- Check for any leaks in the 

system

AL

04

Domestic hot water 

sensor fault (return 

sensor fault for T 

models)

- Check connections

- Check the sensor is 

working

AL

05 Delivery sensor (SM) 

fault

- Check connections

- Check the sensor is 

working

AL

06 No flame detection

- Check the integrity of the 

electrode and check that it 

is not grounded

- Check gas availability and 

pressure

- Check the operation of the 

gas valve

AL

07 Safety thermostat (TS), 

intervention

- Check the sensor or ther-

mostat connections

- Deaerate the system

- Check the bleed valve

- Replace the sensor or the 

thermostat

- Check that the pump im-

peller is not blocked

AL

08 Fault in the flame 

detection circuit

- Check the integrity of the 

electrode and check that it 

is not grounded

- Check the operation of the 

gas valve

AL

09 No water circulating in 

the system

- Check the rotation of the 

pump rotor

- Check the electrical con-

nections

- Replace the pump

Summary of Contents for MIA-30

Page 1: ...838 INSTALLATION AND SERVICING INSTRUCTIONS ENSURE THAT THESE INSTRUCTIONS ARE LEFT FOR THE USER AFTER COMPLETION OF THE BENCHMARK SECTION PLEASE READ THE IMPORTANT NOTICE WITHIN THIS GUIDE REGARDING...

Page 2: ...into its installation location Manoeuvring the boiler may include the use of a sack truck and involve lifting pushing and pulling Caution should be exercised during these operations Operatives should...

Page 3: ...3...

Page 4: ...ssioning instructions for filling in the checklist at the back of this installation guide Note All Gas Safe registered installers carry a ID Card You can check your installer is Gas Safe Registered by...

Page 5: ...ign Directive 2009 125 EC Regulation UE N 811 2013 813 2013 Energy labelling Regulation EU No 2017 1369 SYMBOLS a WARNING To indicate actions which if not carried out correctly can result in injury of...

Page 6: ...on guide If the power cable is damaged replace it with a cable ordered as a spare part with the same characteristics type X Assembly must be by carried out by a qualified professional m WARNINGS It is...

Page 7: ...he safety or adjustment devices without authorization and in structions from the manufacturer d DO NOT To block the condensate drain To pull detach or twist the electrical cables coming out of the app...

Page 8: ...8...

Page 9: ...S SAFE REGISTERED BY CALLING ON 0800 408 5500 OR ALTERNATIVELY WWW GASSAFEREGISTER CO UK 1 USING THE BOILER MIA 30 10 1 1 Control panel 10 1 2 Preliminary checks 11 1 3 Ignition 11 1 4 Adjusting the d...

Page 10: ...he boiler is op erating in Summer mode or if only the domestic hot water mode is enabled via the remote control If the symbols l and n are flashing this indicates that the chimney sweep function is ac...

Page 11: ...set the main system switch to ON ON Fig 3 on the display check that the operating mode on the dis play is SUMMER land if necessary select it by pressing and holding the button s for at least 1 second...

Page 12: ...ibed here contact a qualified technical professional 2 SHUTDOWN 2 1 Temporary shutdown To temporarily interupt the boiler operation press and hold the button s for at least one second once if in WINTE...

Page 13: ...t on pro tective gloves 3 2 1 Cleaning the case When cleaning the cladding use a cloth dampened with soap and water or alcohol for stubborn marks d DO NOT Do not use abrasive products 4 DISPOSAL 4 1 D...

Page 14: ...14...

Page 15: ...E APPLIANCE 16 5 1 Characteristics 16 5 2 Check and safety devices 16 5 3 Identification 16 5 4 Structure 17 5 5 Technical features 18 5 6 Main water circuit 19 5 7 Sensors 20 5 8 Expansion vessel 20...

Page 16: ...te the appliance with safety devices which do not work or which have been tampered with a WARNING Safety device may only be replaced by professional qualified personnel using Sime Ltd original spare p...

Page 17: ...trol panel 10 Domestic hot water heat exchanger 11 Gas valve 12 Pressure gauge 13 Flow meter 14 System relief valve 15 Boiler drain 16 Pump 17 Water pressure switch 18 Automatic bleed valve 19 Fan 20...

Page 18: ...Minimum heat input kW 4 8 D H W flow rate T 30 C l min 14 2 Continuous D H W flow rate T 25 C T 35 C l min 17 5 12 5 Minimum D H W flow rate l min 2 Max Min Pressure bar 7 0 5 kPa 700 50 ENERGY PERFO...

Page 19: ...4 13 15 16 18 19 10 9 7 11 17 20 12 6 M U G E R Sc S 8 2 1 21 22 23 24 Fig 12 KEY M System flow R System return U Domestic hot water outlet E Domesti hot water inlet S Safety valve outlet G Gas supply...

Page 20: ...cs Description U M MIA 30 Total capacity l 7 0 Prefilling pressure kPa 100 bar 1 0 Useful capacity l 4 45 Maximum system content l 110 Conditions of Average operating temperature 70 C with high temper...

Page 21: ...op erating in Summer mode or if only the domestic hot water mode is enabled via the remote control If the symbols l and n are flashing this indicates that the chimney sweep function is active n WINTE...

Page 22: ...SY HOME or HOME or HOME PLUS remote control alternative to TA1 To connect the TA remove the jumper between terminals 5 6 Fig 15 m CAUTION Installer must Connect the boiler to a 230v 50Hz single phase...

Page 23: ...23...

Page 24: ...tions by competent persons and that it meets the require ments of the appropriate Building Regulations The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and shoul...

Page 25: ...ional 28 6 10 Condensate outlet collection 28 6 11 Gas supply 28 6 12 Connecting the flue 29 6 12 1 Flue Terminal Positions 29 6 12 2 Installation of coaxial flues 60 100mm 80 125mm 30 6 12 3 Installa...

Page 26: ...the appliance is to be handled manually tilting it slightly lifting it and applying pres sure in the points indicated in the figure Fig 18 d DO NOT To grip the appliance casing Hold the solid parts o...

Page 27: ...amage to pump and valves boiler noise and circulation problems Before connecting the boiler the associated central heating system must be flushed in accordance with the guidelines given in BS 7593 Tre...

Page 28: ...eel is NOT suitable It should be noted that the connec tion of a condensate pipe to a drain may be subject to local building control requirements Dealing with Condensate see Appendix 1 6 11 Gas supply...

Page 29: ...e a nuisance should be avoided 75 mm 200 mm 75 mm 300 mm 1 200 mm 600 mm 300 mm 600 mm 1 200 mm 300 mm 3 in 8 in 3 in 12 in 48 in 24 in 300 mm 12 in 12 in 24 in 48 in 300 mm 12 in 1 500 mm 300 mm 300...

Page 30: ...lled a diameter of 80 125 code 8095970 reduces the available length by 1 0 metres HORIZONTAL FLUES MUST BE LEVEL NOTE Before connecting accessories it is always advisable to lubricate the internal par...

Page 31: ...let exhaust fitting code 8091401 10 Articulated tile code 8091300 11 Vertical roof terminal code 8091204 13 Inlet exhaust fitting code 8091401 14 Coaxial Terminal code 8091204 1 10 This loss includes...

Page 32: ...thermostat timer or a dedicated control listed below For connection de tails see section External timers and Room Thermostats DESCRIPTION CODE External sensor kit 3435 NTC 10KOhm at 25 C 8094101 Power...

Page 33: ...er the mains power is disconnected by setting the main system switch to OFF Sime Ltd declines all responsible for any injury or damage to persons animals or property as a result of failure to provide...

Page 34: ...nsor and room ther mostat R M SE TA CR Fig 32 MULTI ZONE system with zone valve room thermostat and external sensor TA TZ1 VZ1 VZ2 VZ3 TZ2 TZ3 SE R M Fig 33 m CAUTION Set the parameter tS 1 7 DELAY SY...

Page 35: ...the primary heat exchanger 3 8 5 4 9 Fig 38 NOTE to completely remove all air from the system it is rec ommended that this operation is repeated a number of times check the pressure on the pressure g...

Page 36: ...r press and hold down the buttons o and at the same time for approximately 12 seconds until the flashing symbols l and n appear on the display as soon as the symbols begin to flash release the button...

Page 37: ...splayed 7 4 List of parameters Type No Description Range U M Step Default CONFIGURATION tS 0 1 Index showing boiler power in kW 1 30 kW 1 tS 0 2 Hydraulic configuration 0 combi 1 system 2 N A 3 N A 4...

Page 38: ...dulation AU Automatic 30 100 10 AU tS 4 1 T Modulating pump delivery Return 10 40 C 1 20 tS 4 2 Select heat pump or boiler convenience only if tS 0 2 6 20 30 C 5 tS 4 3 Heat pump boiler aid activation...

Page 39: ...SPLAYED Type No Description Range U M Step CO 0 0 total no of boiler operating hours 0 99 h x 1000 0 1 from 0 0 to 9 9 1 from 10 to 99 CO 0 1 total no of burner operating hours 0 99 h x 1000 0 1 from...

Page 40: ...l position and refit the front panel 2 Now con duct a flue gas analysis as detailed in APPENDIX 2 take a reading of the combustion data and measure the combustion efficiency press the button to make t...

Page 41: ...shown in Parameter setting and display page 37 and adjust the parameter 15 tS 1 5 to that value Example Heating system with 8 radiators average 1 5 kW per radia tor total heat Requirement 12 kW 8 x 1...

Page 42: ...regulations Make sure that the system components and pipes are not hot risk of burning a WARNING Before carrying out any interventions described isolate the power supply isolate the gas cock avoid co...

Page 43: ...ombustion chamber The combustion chamber and the burner do not require any particular maintenance Simply brush them with a soft brush 8 3 3 Checking the ignition detection electrode Check the state of...

Page 44: ...G20 1 G31 0 or 1 To enter Parameter setting and display refer to the indica tions provided in the specific section Once the parameters in the table have been set you must car ry out the entire phase...

Page 45: ...k delivery sensor operation and position AL 74 Second delivery sensor fault Check second delivery sensor operation and position AL 77 EV2 SGV current max min absolute limits error Check gas valve and...

Page 46: ...no what is the maximum central heating output selected kW Dynamic gas inlet pressure mbar C Central heating return temperature C System correctly balanced rebalanced Yes COMBINATION BOILERS ONLY Is t...

Page 47: ...eer name Company name Telephone No Gas Safe registration No Max rate CO ppm CO CO CO Min rate CO ppm CO CO CO undertaken in accordance with manufacturers instructions and readings are correct yes Gas...

Page 48: ...48 9 EXPLODED VIEWS Frame...

Page 49: ...49 Hydraulic assembly...

Page 50: ...50 Exchanger Combustion...

Page 51: ...51 Control panel...

Page 52: ...52 Additional components...

Page 53: ...53...

Page 54: ...ing cli 051 6281674 Group air intake C 052 6281667 Front panel insulators A Pos Code Description Advised parts 053 2030249 Gasket 24x17x3 054 6319653 External by pass kit C 055 6265866 C H flow manifo...

Page 55: ...ork must be a minimum of 19mm ID typically 22mm OD plastic pipe or as per manufacturer s instructions and this should fall a minimum of 45mm per metre away from the boiler taking the shortest practica...

Page 56: ...ir break is required Key 1 Boiler 2 Visible air break 3 75 mm trap 4 Visible air break and trap not required if there is a trap with a minimum condensate seal of 75 mm incorporated into the boiler 5 S...

Page 57: ...nimum condensate seal of 75 mm incorporated into the boiler In this case the 100 mm is measured to the trap in the boiler 5 Sink basin bath or shower 6 Open end of condensate discharge pipe direct int...

Page 58: ...er level end cut at 45 Note the maximum external condensate discharge length is 3 metres 6 Minimum internal diameter 19 mm 7 Pipe size transition 8 Minimum internal diameter 30 mm 9 Water weather proo...

Page 59: ...used External waste pipes from kitchens utility rooms or bathrooms such as sink basin and bath or shower waste outlets should be insulated with waterproof UV resistant class 0 material terminated bel...

Page 60: ...4 5 75mm sink waste trap 2 5 4 3 Key 1 Boiler 2 Visible air break at plug hole 3 75 mm sink basin bath or shower waste trap 4 Sink basin bath or shower with 5 Open end of condensate discharge pipe di...

Page 61: ...ons should be followed The condensate pipe should be run internally as far as possible before going externally and the pipe diameter should be increased to a minimum of 30mm ID typically 32mm OD befor...

Page 62: ...of 75mm incorporated into the boiler 5 Soil and vent stack 6 Invert 7 450mm minimum upto three storeys 8 Minimum internal diameter 19 mm 9 Pipe size transition point 10 Minimum internal diameter 30mm...

Page 63: ...ub zero temperatures i e 15 C for 48 hours BS6798 refers to devices that gas BS6798 section 6 3 8 note 4 The boiler manufacturer s instructions will disposal of the condensate Additional Measures meas...

Page 64: ...wed Insulation Materials Insulation used for external condensate pipes sink or washing machine waste pipes should be of class O grade with an outer coating that is weather proof is recommended for 32m...

Page 65: ...ate discharge pipe from boiler 2 Pipe size transition point 3 Water weather proof insulation 4 43mm 90 male female bend 5 External rain water pipe into foul water 6 External air break 7 Air gap 8 9 Mi...

Page 66: ...14 or boiler installation manual for soakaway design requirements any above ground section of condensate discharge pipe should be run and insulated as described above Figure 7 following page shows a s...

Page 67: ...incorporated into the boiler refer to manufacturers instructions 5 External length of pipe 3 m maximum 6 Open end of condensate discharge pipe direct into gully 25 mm min below grating but above water...

Page 68: ...be run either above or below round level End cut at 45 3 Diameter 100 mm minimum plastic tube 4 Bottom of tube sealed 5 Limestone chippings 6 Two rows of three 12 mm holes at 25 mm centres 50 mm from...

Page 69: ...onnected to the boiler Is O2 less than or equal to 20 6 and CO2 less than 0 2 VERIFY FLUE INTEGRITY Analyser readings indicate that combustion products and inlet air must be mixing Further investigati...

Page 70: ...l combustible consumption GJ 17 C H seasonal energy efficiency 93 D HW energy efficiency 86 Sound power dB A 57 Specific precautionary measures to be adopted at the time of assembly installation or ma...