84
IT
ES
PT
GB
RUS
AIR CALIBRATION
Electrically disconnect the hea-
ting probe (SM) and connect
the wires to another similar
free probe. Turn the heating
potentiometer knob to the
maximum setting, remove the
knob and connect the differen-
tial manometer (+ sign) to the
air pressure intake [7 - Drawing
1].
Sequence of operations:
1)
Turn the heating power trim-
mer anticlockwise to the
bottom of the scale B [6 -
Drawing 2].
2)
Calibrate the air signal using
the minimum fan power
adjustment trimmer A [4 -
Drawing 2] to obtain the
figure in mmH
2
O shown in
the table:
3)
Turn on a hot water tap to
bring the boiler up to maxi-
mum hot water power.
4)
Calibrate the air signal using
the maximum fan power
adjustment trimmer D [2 -
Drawing 2] to obtain the
figure in mmH
2
O shown in
the table:
GAS CALIBRATION
Connect the differential mano-
meter (+ sign) with decimal
scale in mm or Pascal to the
gas intake [6 - Drawing 3].
Sequence of operations:
1)
Turn the heating power adju-
stment trimmer anticlockwi-
se to the bottom of the
scale B [6 - Drawing 4].
2)
Fully open the gas capacity
step [7 - Drawing 5]
3)
Calibrate
gas
pressure
using the OFF-SET adjust-
ment screw [8 - Drawing 5]
to obtain the figure in
mmH
2
O shown in the table:
4)
Close the gas capacity step
[7 - Drawing 5] to obtain the
figure in mmH
2
O shown in
the table:
After completion of calibration operations, check CO
2
values using a combustion analyser. If discrepancies are found with respect to the
values appearing in the tables, correct as necessary:
– Use the OFFSET screw (
8 – Drawing 5
) to correct CO
2
at “MIN” output.
– Use the capacity step to correct CO
2
at “MAX” output (
7 – Drawing 5
).
25 BF
30 BF
G20
13,0
13,0
G31
13,0
13,0
“Format Dewy.zip 25 BF”
“Format Dewy.zip 30 BF”
CO
2
(Methane)
CO
2
(Propane)
CO
2
(Methane)
CO
2
(Propane)
“MIN” power
9,0 ±0,3
9,9 ±0,2
9,0 ±0,3
9,9 ±0,2
“MAX” power
9,0 ±0,3
9,9 ±0,2
9,0 ±0,3
9,9 ±0,2
GAS CONVERSION
– Close the gas cock.
– Replace the injector (pos. 30)
and the relevant gasket (pos.
45).
– Cut the specified resistance on
the fan control board.
– Test for soundness all the gas
connections using soapy water
or appropriate products.
DO NOT USE NAKED FLAMES.
– Stick onto the casing panel the
plate showing the relevant fee-
ding gas.
– Proceed with air and gas cali-
bration as described below.
32
28
106
16
14
28
34
35
64
6
45
57
30
29
Drawing 1
Drawing 3
Adjustment and control operations must be performed with the heater in operation while heating is underway
6
2
4
Drawing 2
6
2
4
Drawing 4
7
8
Drawing 5
25 BF
30 BF
G20
93,0
93,0
G31
93,0
93,0
25 BF
30 BF
G20
12,0
12,0
G31
13,0
13,0
25 BF
30 BF
G20
10,5
10,5
G31
12,5
12,5
4.4
BOILER CALIBRATION