background image

30

IT

GB

FR

BE

DE

2.7 

CONTROL UNIT 

RVA 43.222 (fig.7)

All  boiler  functions  can  be  controlled  by

the optional control unit code 8096303,

supplied  with  an  outdoor  temperature

probe  (SE)  and  boiler  immersion  probe

(SC)  (fig.  14).    Use  of  the  control  unit

requires  the  connection  of  an  additional

series  of  low  voltage  connectors  for  the

connection of probes and the room tem-

perature  control  unit  (the  connectors

ar e  supplied  in  a  bag  in  the  contr ol

panel).  The  probe  bulb  of  the  external

boiler,  if  there  is  any,(SS),  optional  cod.

6277110,  must  be  inserted  in  the  hot

water  sheath  and  the  boiler  probe  (SC)

in the boiler sheath. To assemble the out-

door  temperature  probe  (SE),  follow  the

instructions  provided  on  the  packaging.

Refer  to  the  wiring  diagram  in  fig.  6  for

electrical connections.

ATTENTION:  For  the  correct  operation

of the control unit set the boiler’s regu-

lating thermostat to the maximum set-

ting.

2.7.1 

Features and functions

The 

‘RVA 43.222

’ has been built as a sin-

gle or double phase regulator of one sin-

gle  boiler  or  as  a  cascade  regulator  for

the control of a maximum of 16 boilers.

Economical operation

–  Heat  production  may  be  turned  on  or

off in the presence of integration with

accumulation.

–  Boiler  temperature  is  controlled  on

the  basis  of  climate,  permitting  envi-

ronmental compensation.

–  There  is    direct  heating  circuit  mana-

gement  (with  pump)  for  each  control-

ler.

–  Automatic  adaptation  to  a  climatic

curve  on  the  basis  of  the  building’s

thermal  inertia  and  the  presence  of

"free  heat"  sources  (with  environmen-

tal compensation).

–  On/off  optimisation  (accelerated  hea-

ting and early off feature).

–  Daily  economy  function  calculated  on

the  basis  of  the  dynamic  characteri-

stics of the building.

– Automatic summer/winter switch.

Protective functions

–  Minimum  and  maximum  delivery  tem-

perature settings.

–  Differentiated  anti-freeze  protection

for  boiler,  hot  water  tank  and  heating

system.

–  Boiler overheating protection.

–  Pump seizing up protection.

–  Burner  protection  with  minimum  ope-

ting temperature.

Operative functions

– Simplified start-up.

–  All  calibration  operations  are  perfor-

med on control unit.

– Standard weekly programming.

–  All  calibration  operations  and  opera-

ting  settings  can  be  read  on  leds  and

display.

– Relay and probe tests.

Hot water production

– Daily scheduling.

–  Minimum  hot  water  delivery  tempera-

ture  may  be  set  for  a  reduced  time

period.

– Control of hot water tank filling pump.

– Selectable priority of hot water circuit.

Other technical features

–  Easy  connection  with  digital  environ-

mental unit (QAA 70).

1

2

0

120

20

100

40

80

6

°

C

Fig. 7

KEY

1  Plastic hole cover

2  Control unit (optional)

Summary of Contents for EKO 3 OF

Page 1: ...he discharge channel of the combustion waste is free Check that gate valves are open if there are any Check that the heating system has been filled with water and that air has been bled out of it Make sure that the circulator is not blocked Purge the system bleeding off the air present in the gas pipe by operating the pressure relief valve on the gas valve inlet FONDERIE SIME Co Ltd based in Garbo...

Page 2: ...E BOILER 1 2 DIMENSIONS 1 2 1 EKO 3 6 OF 3 4 OF PVA version CONNECTIONS M Delivery to heating system R 1 UNI ISO 7 1 M1 Delivery to heating system PVA ver R 1 UNI ISO 7 1 G Gas supplier R 3 4 UNI ISO 7 1 R Return to heating system R 1 UNI ISO 7 1 S Boiler discharge pipe Rp 1 2 UNI ISO 7 1 C1 Boiler loading vers PVA Rp 1 2 UNI ISO 7 1 L P K ø D 3 0F 460 675 110 3 OF PVA 460 675 60 110 4 0F 560 675 ...

Page 3: ...t 16 5 mbar and when downstream at 11 5 mbar 6 Intermittent pilot 7 Combustion chamber door 8 Burner manifold 9 Pressure intake 10 Pump EKO 7 OF EKO 8 12 OF KEY 1 Gas valve 2 Probe measurement sheath 3 Control Panel 4 Gas pressure switch with minimum rates of pressure in the system calibrated for G20 in ascent at 16 5 mbar and in descent at 11 5 mbar 6 Intermittent pilot 7 Combustion chamber door ...

Page 4: ...312BP4117 1312BP4117 Category II2H3P II2H3P II2H3P II2H3P II2H3P II2H3P Type B11BS B11BS B11BS B11BS B11BS B11BS Maximum operating pressure bar 4 4 4 4 4 4 Maximum operating temperature C 85 85 85 85 85 85 Water contained in Boiler l 14 18 17 22 20 23 Boiler s cast iron elements n 3 3 4 4 5 6 Temperature regulation C 40 85 40 85 40 85 40 85 40 85 40 85 Expansion tank Capacity pressure preloading l...

Page 5: ...8 1312BP4118 1312BP4118 1312BP4118 Category II2H3P II2H3P II2H3P II2H3P II2H3P II2H3P Type B11 B11 B11 B11 B11 B11 Maximum operating pressure bar 4 4 4 4 4 4 Maximum operating temperature C 85 85 85 85 85 85 Water contained boiler l 26 29 32 35 38 41 Boiler s cast iron elements n 7 8 9 10 11 12 Temperature regulation C 40 85 40 85 40 85 40 85 40 85 40 85 Principle Gas Nozzles Quantity of Nozzles n...

Page 6: ...ed 20 C For this reason it is advisable to install a mixer valve CAUTION The system circulation pump or pumps must go into action at the time of boiler ignition For this reason you are recommended to use an auto matic system of precedence The gas connection must be made using seamless steel pipe Mannesmann type which is galvanized and has threaded joints provided with gaskets excluding three piece...

Page 7: ...ust be rounded off with a radium of no less than 20 mm hydraulically equivalent sections are also permitted fitted with a chimney at the top the outlet of which must be outside the so called reflux area to prevent for mation of counter pressure preven ting the products of combustion from being freely released into the environ ment It is thus necessary to comply with the minimum heights shown in fi...

Page 8: ...tallation of an optional control unit RVA 43 222 cod 8096303 marked with different colours black orange and brown fig 5 Connectors are polarised so that the order cannot be inverted To install the control unit connect these connectors and remove jumpers 13 14 and 15 17 marked with bold letters in the electric system of the figure 6 from the terminal board The control unit also permits the use of r...

Page 9: ...E Type QAC31 outdoor temperature probe optional SC Type QAZ21 boiler immersion probe optional SS Type QAZ21 boiler immersion probe optional PI Heating system pump vers 3 4 OF PVA PB Boiler pump C Connectors of the control unit black orange brown F Fuse T 200 mA TI Insulation transformer only for FR BE PBY Recirculation pump TM Minimum temperature thermostat Only for vers 3 4 OF PVA NOTE During the...

Page 10: ...lation Boiler temperature is controlled on the basis of climate permitting envi ronmental compensation There is direct heating circuit mana gement with pump for each control ler Automatic adaptation to a climatic curve on the basis of the building s thermal inertia and the presence of free heat sources with environmen tal compensation On off optimisation accelerated hea ting and early off feature ...

Page 11: ...en though the pilot bur ner is lit After 60 seconds have ela psed the sparks cease the burner goes out and the warning lamp indica ting equipment lock out lights up This occurs when the positions of live and neutral have not been respected on the terminal block There is a break in the wire of the sensing electrode or the electrode itself is earthed the electrode is worn out and needs repla cing Th...

Page 12: ... the working pressures have been adjusted reseal the regulators When the gas pressures are to be reset this must be done following a set order first the maximum pressure and then the minimum 4 INSTRUCTIONS FOR USE AND MAINTENANCE 9 1 4 3 7 8 2 KEY 1 Coil EV1 2 Pressure regulator 3 Coil assembly 4 Coil EV2 7 Pressure inlet upstream 8 Pressure inlet downstream 9 Gas pressure switch of minimum rate a...

Page 13: ...n upstream at 27 mbar and when downstream at 22 mbar In the models with a gas valve VRB 25PA instead turn the knob of the mini mum rate pressure 9 fig 9 chan ging the rate from 11 5 mbar for G20 to 22 mbar for G31 In order to regulate the power heat fol low the instructions of 4 1 Once the operating pressures have been changed seal the regulators Apply the plate provided in the kit for identificat...

Page 14: ...ich covers a rate from 40 to 85 oC The temperature that has been fixed can be controlled on the thermometer SAFETY THERMOSTAT fig 16 The safety thermostat is of the manually resetting type and turns on IGNITION AND FUNCTIONING 0 120 20 100 40 80 6 C Fig 14 Fig 15 0 120 20 100 40 80 6 C USER S INSTRUCTIONS WARNINGS In case of fault and or incorrect equipment operation deactivate the boiler without ...

Page 15: ...y Should the boiler continue to lock out it will be necessary to make a careful check of the flue pipe making all the necessary modifications and amendments so that it can work properly LOCK OUT RESET OF THE CONTROL BOX fig 18 If the burner fails to ignite the red led on the reset button will turn on Press the button to restart the boiler automatically fig 18 Should the boiler lock out again you m...

Page 16: ...emperature Increase or reduce the temperature of the room with the regulating knob In the case of reduced temperature NOTE After each regulation wait at least two hours for the new temperature to expand through the room TO CHANGE THE HEATING PERIODS With reference to the day chosen set the changes as following NOTE The heating periods automatically repeat on a weekly basis To this end select the a...

Reviews: