The  boiler  must  be  connected    to  a  sin-

gle  phase  230V-  50Hz  power  supply

through  a  main  switch  protected  by  a

fuse  with  at  least  3  mm  between  con-

tacts (fig. 13). The installation of a room

thermostat is recommended in order to

obtain  a  better  regulation  of  the  tempe-

rature  and  facility  within  the  premises,

has  to  be  of  II  class,  and    conform  with

the  EN  60730.1  norm  (clean  electrical

connection).

NOTE:  SIME shall not accept any liabi-

lity for damage or injury resulting from

failure to ground the boiler.

2.6.1  CONNECTION OF THE

CONTROL UNIT

The electrical circuit includes a series of

connectors for installation of an optional

control unit, RVA 43.222 cod. 8096303,

marked  with  different  colours:  black,

orange  and  brown  (fig.  5).  Connectors

are polarised so that the order cannot be

inverted.

To install the control unit, connect these

connectors and remove jumpers 13 - 14

and  15  -  17  (marked  with  bold  letters  in

the electric system of the figure 6) from

the terminal board.

The  control  unit  also  permits  the  use  of

room temperature control units and pro-

bes;  the  polarised,  coloured  connectors

of  these  are  located  in  a  bag  inside  the

control panel.

28

IT

GB

FR

BE

DE

1

2

3

4

6

7

Fig. 5

KEY

1  Interference filter

2  Connectors of control unit (black/ red/ brown)

3  Electronic device FM 12

4  Boiler’s terminal board

6  Insulation transformer (for FR/BE) 

7  Connector connection of the insulation transformer

black

or

ange

br

o

w

n

Summary of Contents for EKO 3 OF

Page 1: ...he discharge channel of the combustion waste is free Check that gate valves are open if there are any Check that the heating system has been filled with water and that air has been bled out of it Make sure that the circulator is not blocked Purge the system bleeding off the air present in the gas pipe by operating the pressure relief valve on the gas valve inlet FONDERIE SIME Co Ltd based in Garbo...

Page 2: ...E BOILER 1 2 DIMENSIONS 1 2 1 EKO 3 6 OF 3 4 OF PVA version CONNECTIONS M Delivery to heating system R 1 UNI ISO 7 1 M1 Delivery to heating system PVA ver R 1 UNI ISO 7 1 G Gas supplier R 3 4 UNI ISO 7 1 R Return to heating system R 1 UNI ISO 7 1 S Boiler discharge pipe Rp 1 2 UNI ISO 7 1 C1 Boiler loading vers PVA Rp 1 2 UNI ISO 7 1 L P K ø D 3 0F 460 675 110 3 OF PVA 460 675 60 110 4 0F 560 675 ...

Page 3: ...t 16 5 mbar and when downstream at 11 5 mbar 6 Intermittent pilot 7 Combustion chamber door 8 Burner manifold 9 Pressure intake 10 Pump EKO 7 OF EKO 8 12 OF KEY 1 Gas valve 2 Probe measurement sheath 3 Control Panel 4 Gas pressure switch with minimum rates of pressure in the system calibrated for G20 in ascent at 16 5 mbar and in descent at 11 5 mbar 6 Intermittent pilot 7 Combustion chamber door ...

Page 4: ...312BP4117 1312BP4117 Category II2H3P II2H3P II2H3P II2H3P II2H3P II2H3P Type B11BS B11BS B11BS B11BS B11BS B11BS Maximum operating pressure bar 4 4 4 4 4 4 Maximum operating temperature C 85 85 85 85 85 85 Water contained in Boiler l 14 18 17 22 20 23 Boiler s cast iron elements n 3 3 4 4 5 6 Temperature regulation C 40 85 40 85 40 85 40 85 40 85 40 85 Expansion tank Capacity pressure preloading l...

Page 5: ...8 1312BP4118 1312BP4118 1312BP4118 Category II2H3P II2H3P II2H3P II2H3P II2H3P II2H3P Type B11 B11 B11 B11 B11 B11 Maximum operating pressure bar 4 4 4 4 4 4 Maximum operating temperature C 85 85 85 85 85 85 Water contained boiler l 26 29 32 35 38 41 Boiler s cast iron elements n 7 8 9 10 11 12 Temperature regulation C 40 85 40 85 40 85 40 85 40 85 40 85 Principle Gas Nozzles Quantity of Nozzles n...

Page 6: ...ed 20 C For this reason it is advisable to install a mixer valve CAUTION The system circulation pump or pumps must go into action at the time of boiler ignition For this reason you are recommended to use an auto matic system of precedence The gas connection must be made using seamless steel pipe Mannesmann type which is galvanized and has threaded joints provided with gaskets excluding three piece...

Page 7: ...ust be rounded off with a radium of no less than 20 mm hydraulically equivalent sections are also permitted fitted with a chimney at the top the outlet of which must be outside the so called reflux area to prevent for mation of counter pressure preven ting the products of combustion from being freely released into the environ ment It is thus necessary to comply with the minimum heights shown in fi...

Page 8: ...tallation of an optional control unit RVA 43 222 cod 8096303 marked with different colours black orange and brown fig 5 Connectors are polarised so that the order cannot be inverted To install the control unit connect these connectors and remove jumpers 13 14 and 15 17 marked with bold letters in the electric system of the figure 6 from the terminal board The control unit also permits the use of r...

Page 9: ...E Type QAC31 outdoor temperature probe optional SC Type QAZ21 boiler immersion probe optional SS Type QAZ21 boiler immersion probe optional PI Heating system pump vers 3 4 OF PVA PB Boiler pump C Connectors of the control unit black orange brown F Fuse T 200 mA TI Insulation transformer only for FR BE PBY Recirculation pump TM Minimum temperature thermostat Only for vers 3 4 OF PVA NOTE During the...

Page 10: ...lation Boiler temperature is controlled on the basis of climate permitting envi ronmental compensation There is direct heating circuit mana gement with pump for each control ler Automatic adaptation to a climatic curve on the basis of the building s thermal inertia and the presence of free heat sources with environmen tal compensation On off optimisation accelerated hea ting and early off feature ...

Page 11: ...en though the pilot bur ner is lit After 60 seconds have ela psed the sparks cease the burner goes out and the warning lamp indica ting equipment lock out lights up This occurs when the positions of live and neutral have not been respected on the terminal block There is a break in the wire of the sensing electrode or the electrode itself is earthed the electrode is worn out and needs repla cing Th...

Page 12: ... the working pressures have been adjusted reseal the regulators When the gas pressures are to be reset this must be done following a set order first the maximum pressure and then the minimum 4 INSTRUCTIONS FOR USE AND MAINTENANCE 9 1 4 3 7 8 2 KEY 1 Coil EV1 2 Pressure regulator 3 Coil assembly 4 Coil EV2 7 Pressure inlet upstream 8 Pressure inlet downstream 9 Gas pressure switch of minimum rate a...

Page 13: ...n upstream at 27 mbar and when downstream at 22 mbar In the models with a gas valve VRB 25PA instead turn the knob of the mini mum rate pressure 9 fig 9 chan ging the rate from 11 5 mbar for G20 to 22 mbar for G31 In order to regulate the power heat fol low the instructions of 4 1 Once the operating pressures have been changed seal the regulators Apply the plate provided in the kit for identificat...

Page 14: ...ich covers a rate from 40 to 85 oC The temperature that has been fixed can be controlled on the thermometer SAFETY THERMOSTAT fig 16 The safety thermostat is of the manually resetting type and turns on IGNITION AND FUNCTIONING 0 120 20 100 40 80 6 C Fig 14 Fig 15 0 120 20 100 40 80 6 C USER S INSTRUCTIONS WARNINGS In case of fault and or incorrect equipment operation deactivate the boiler without ...

Page 15: ...y Should the boiler continue to lock out it will be necessary to make a careful check of the flue pipe making all the necessary modifications and amendments so that it can work properly LOCK OUT RESET OF THE CONTROL BOX fig 18 If the burner fails to ignite the red led on the reset button will turn on Press the button to restart the boiler automatically fig 18 Should the boiler lock out again you m...

Page 16: ...emperature Increase or reduce the temperature of the room with the regulating knob In the case of reduced temperature NOTE After each regulation wait at least two hours for the new temperature to expand through the room TO CHANGE THE HEATING PERIODS With reference to the day chosen set the changes as following NOTE The heating periods automatically repeat on a weekly basis To this end select the a...

Reviews: