25
EN
Connections to be made by the installer
The electrical connections to be made include:
– power supply 230V - 50Hz with magnetothermic switch
– connection of the room thermostat (TA) or timer-controlled
thermostat, after having removed the jumper between termi-
nals 4 and 5
– if a time programmer is used, remove the bridge between ter-
minals 5 and 8 and connect the programmer timer-controlled
thermostat (CTP) to terminals 5, 7, 8 and 9.
RONDÒ
/
ESTELLE
4-
5 ErP BE
230 V - 50 Hz
TA
PI
MIQ
CTP 5 3
1 2
N L
L N 1
2
3
4
5
6
7
8
9 10
BR
GR
BL
Connection to the burner
Fig. 32
RONDÒ
/
ESTELLE
6-
7 ErP BE
230 V - 50 Hz
TA
PI
MIQ
CTP 5 3
1 2
N L
L N 1
2
3
4
5
6
7
8
9 10
BR
GR
BL
Connection to the burner
Fig. 33
KEY:
L
Line / Live
N
Neutral
TA
Room thermostat
PI
System pump
MIQ
Terminal block inside the panel
CTP
Programmer timer-controlled thermostat
m
WARNINGS
It is compulsory:
– to use an omnipolar cut-off switch, disconnect
switch, in compliance with EN standards (contact
opening of at least 3 mm)
– to respect connection L (Live) - N (Neutral)
– use cables with 1,5 mm
2
cross-sectional size, com-
plete with the bootlace ferrules
– to refer to the electrical diagrams in this manual for
any electrical intervention
– to connect the earth wire to an effective earthing
system (*).
d
IT IS FORBIDDEN
– to use the water pipes to earth the appliance.
(*)
The manufacturer is not responsible for any damage
caused by failure to earth the appliance or failure to ob-
serve the information provided in the wiring diagrams.
6.11 Refilling or emptying
a
WARNING
Sime
RONDÒ/ESTELLE 4-5-6-7 ErP BE
boilers are NOT
equipped with a system filling device. The system
must be fitted with a pressure gauge (A), to check that
the (cold) water pressure is between 1 and 1.2 bar
(98–117.6 kPa) and a loading/filling valve (B).
6.11.1 SYSTEM REFILL operations
Before carrying out filling interventions:
– check that the system’s main switch is set to “OFF”
– check that the system drainage valve (1) is closed
– connect a pipe to the manual relief valve (2) and bring it to a
provisional drain
– manually open the manual relief valve (2) to facilitate the ex-
pulsion of air from the calorifier coil
– once the system filling phase has terminated, close the man-
ual relief valve (2)
– open the system filling valve (B)
– slowly charge the system until the pressure gauge (A), mount-
ed on the system, gives a reading (with the system cold) of
1
and 1,2 bar
– close the filling valve (B) and the manual bleed valve (2).
NOTE:
if the pressure exceeds the maximum value specified,
open the relief valve of any radiator (some water will come out)
until the correct value is reached.
2
1
0
4
1
3
2
bar
A
B
Fig. 34