4
Chapter 1: Touring the Chassis
Caution:
The door must be in place during operation to comply with FCC
regulations and for proper air flow.
On/Off switch controls power to all the drives (see Figure 1-2).
Drive shelves
house the SCSI drives and drive sleds. The shelves are
removable to accommodate full-height drives.
Note:
Each full-height drive occupies two half-height slots.
Rear View Components
Figure 1-3 shows major components visible at the back of the Vault L
differential storage box and Figure 1-4 shows the rear view of the mixed-
channel configuration.
Note:
The mixed-channel version has a connector called SE TERM: A. This
connector is not present on the differential Vault L storage box.
Summary of Contents for CHALLENGE Vault L CMN A01
Page 1: ...CHALLENGE Vault L Owner s Guide Document Number 007 2443 001 ...
Page 4: ......
Page 6: ......
Page 7: ...vii Tables Table A 1 Vault L Storage Box Specifications 17 ...
Page 8: ......
Page 12: ......
Page 20: ......
Page 28: ...Figure 2 5 Voltage Selection Switch Voltage switch ...
Page 31: ......