General Procedure to Close the Chassis
63
General Procedure to Close the Chassis
Follow these steps after you have finished the procedure described in the previous
sections.
1.
Close the front subchassis.
2. Reinstall the front and rear foam covers.
3. Reinstall the access cover using the original screws.
4. Reinstall the existing and/or new power supplies.
5. Reconnect all AC power and peripheral device cables to the rear of the system and
to wall outlets.
6. Run the FRUSDR load utility to properly configure the system after adding new
components. See Chapter 3 of the SGI 1400 Server Family User’s Guide.
Summary of Contents for 1400
Page 1: ...SGI 1400 Server Family Maintenance and Upgrades Guide Document Number 007 3948 001 ...
Page 12: ......
Page 14: ......
Page 30: ...16 Chapter 1 Working Inside the System Figure 1 7 Removing EMI Shields ...
Page 70: ......
Page 78: ......
Page 130: ......
Page 150: ......
Page 152: ......
Page 156: ......
Page 162: ......