48
Chapter 2: Upgrading Baseboard Components
Figure 2-8
Installing a Heatsink on a Processor S.E.C. Cartridge
The locations shown in Figure 2-8 are:
1.
Processor S.E.C. Cartridge
2. Processor Connector
3. The heatsink edge that goes TOWARD the connector on the S.E.C. cartridge (the
grease square is off-centered toward this edge)
4. Screw hole (five total attach the heatsink to a cartridge)
5. Example screw
6. Grease square (adhesive film must be removed before mounting)
7. Center screw hole: note that the grease square is off-centered from this screw hole
toward the edge (as indicated in callout 3)
3
6
4
5
1
2
7
Summary of Contents for 1400
Page 1: ...SGI 1400 Server Family Maintenance and Upgrades Guide Document Number 007 3948 001 ...
Page 12: ......
Page 14: ......
Page 30: ...16 Chapter 1 Working Inside the System Figure 1 7 Removing EMI Shields ...
Page 70: ......
Page 78: ......
Page 130: ......
Page 150: ......
Page 152: ......
Page 156: ......
Page 162: ......