
- 71 -
Copyright © 2018-2019 SIGNATURE KITCHEN SUITE.
All rights reserved. Only training and service purposes.
9-2-4. Charging Tube Connection Step
Required equipment:Charging tube,LokRing Tool
• Remove a charging pipe to recharge R600a refrigerant after completing work,and then connect a charging tube with LokRing.
Processing(Charging)
Discharge
Suction
9-2-5. Vacuum Air Removal
Required equipment:Vacuum pump
• Connect a vacuum pump to a charging tube to perform vacuum cycle.
• Vacuum work should be performed for an hour.(If vacuum time is short,normal cooling performance may not be exerted due to
failure of cooling cycle.)
Summary of Contents for SKSCW181RP
Page 82: ......