Publication date:Oct., 2012
Revision A2
21
•
TP Port and Cable Installation
⇒
In the switch, TP port supports MDI/MDI-X auto-crossover, so both types of
cable, straight-through and crossed-over can be used. It means you do not have
to tell from them, just plug it.
⇒
Use Cat. 5 grade RJ-45 TP cable to connect to a TP port of the switch and the
other end is connected to a network-aware device such as a workstation or a
server.
⇒
Repeat the above steps, as needed, for each RJ-45 port to be connected to a
Gigabit 10/100/1000 TP device.
Now, you can start having the switch in operation.
••••
AC
Power On ( For SIGNAMAX 065-7851 L2 )
The switch supports 100-240 VAC, 50-60 Hz power supply. The power
supply will automatically convert the local AC power source to DC power. It does not
matter whether any connection plugged into the switch or not when power on, even
modules as well. After the power is on, all LED indicators will light up immediately
and then all off except the power LED still keeps on. This represents a reset of the
system.
DC Power installation (For SIGNAMAX 065-7851 L2 D)
Power requirement 48 VDC (36~72VDC)
You have to add DC power through the removable terminal block from external DC
power source.
Wiring the Power Input
1.
Insert the positive and negative wires into the + and – terminal Block
2.
Tighten the wire-clamp screw to prevent the DC wires from being
loosened.
3.
Insert the Ground wire into the “GND” terminal block
Note: The Suitable working voltage is from 36 to 72 VDC.
••••
Firmware Loading
After resetting, the bootloader will load the firmware into the memory. It will
take about 30 seconds, after that, the switch will flash all the LED once and
automatically performs self-test and is in ready state.
Fig. 2-1-2 Insert the positive and negative wires into the terminal block
Summary of Contents for 065-7851
Page 1: ......
Page 2: ......
Page 62: ...Publication date Oct 2012 Revision A2 60 Fig 3 12 ...
Page 101: ...Publication date Oct 2012 Revision A2 99 Fig 3 34 ...
Page 104: ...Publication date Oct 2012 Revision A2 102 Fig 3 37 Fig 3 38 Fig 3 39 ...
Page 105: ...Publication date Oct 2012 Revision A2 103 Fig 3 40 Fig 3 41 ...
Page 106: ...Publication date Oct 2012 Revision A2 104 Fig 3 42 ...
Page 121: ...Publication date Oct 2012 Revision A2 119 Fig 3 61 Set up VLAN Tag Priority Mapping ...
Page 122: ...Publication date March 2011 Revision A1 120 Fig 3 62 Set up VLAN Tag Priority Mapping Finish ...
Page 136: ...Publication date Oct 2012 Revision A2 134 Fig 3 69 Frame Type Fig 3 70 ...
Page 137: ...Publication date Oct 2012 Revision A2 135 Fig 3 71 Fig 3 72 Fig 3 73 ARP ...
Page 138: ...Publication date Oct 2012 Revision A2 136 Fig 3 74 ARP Fig 3 75 ARP Fig 3 76 ARP Fig 3 77 ARP ...
Page 139: ...Publication date Oct 2012 Revision A2 137 Fig 3 79 ARP Fig 3 80 ARP Fig 3 81 ARP ...
Page 141: ...Publication date Oct 2012 Revision A2 139 Fig 3 87 ARP Fig 3 88 IPv4 ...
Page 145: ...Publication date Oct 2012 Revision A2 143 Fig 3 103 IPv4 Fig 3 104 IPv4 Fig 3 105 IPv4 ...
Page 146: ...Publication date Oct 2012 Revision A2 144 Fig 3 106 IPv4 Fig 3 107 IPv4 Fig 3 108 IPv4 ...
Page 147: ...Publication date Oct 2012 Revision A2 145 Fig 3 109 IPv4 Fig 3 110 IPv4 Fig 3 111 IPv4 ...
Page 148: ...Publication date Oct 2012 Revision A2 146 Fig 3 112 IPv4 Fig 3 113 IPv4 Fig 3 114 IPv4 ...
Page 149: ...Publication date Oct 2012 Revision A2 147 Fig 3 115 IPv4 Fig 3 116 IPv4 Fig 3 117 IPv4 ...
Page 150: ...Publication date Oct 2012 Revision A2 148 Fig 3 118 Action Fig 3 119 Rate Limiter ...
Page 151: ...Publication date Oct 2012 Revision A2 149 Fig 3 120 Port Copy Fig 3 121 DMAC Filter ...
Page 250: ...Publication date Oct 2012 Revision A2 248 Fig 4 1 Fig 4 2 ...