background image

14

 

 

Filling

 

of

 

the

 

collector(s)

 

with

 

water

 

and

 

antifreeze

 

shall

 

be

 

done

 

in

 

the

 

morning

 

or

 

in

 

the

 

afternoon

 

during

 

summer

 

months,

 

in

 

order

 

to

 

avoid

 

forming

 

of

 

air

 

bubbles

 

due

 

to

 

overheating,

 

thus

 

causing

 

air

 

trapping,

 

because

 

then

 

the

 

system

 

would

 

not

 

be

 

properly

 

ventilated

 

and

 

it

 

is

 

possible

 

to

 

retain

 

which

 

would

 

reduce

 

performance.

  

Filling

 

up

 

of

 

the

 

collector(s)

 

is

 

to

 

be

 

done

 

with

 

low

 

flow,

 

to

 

let

 

liquid

 

to

 

come

 

out

 

from

 

the

 

opposite

 

copper

 

pipe

 

for

 

better

 

ventilation.

  

The

 

filling

 

with

 

antifreeze

 

is

 

to

 

be

 

done

 

according

 

to

 

the

 

instructions

 

of

 

the

 

antifreeze

 

(see

 

table)

 

i.e.

 

according

 

to

 

the

 

exterior

 

temperature

 

C

 

under

 

which

 

the

 

system

 

is

 

functioning.

 

 

8.VENTILATION

 

 

 

Special

 

attention

 

is

 

needed

 

to

 

provide

 

adequate

 

ventilation

 

for

 

the

 

collector(s)

 

so

 

the

 

system

 

runs

 

without

 

problems.

 

Let

 

the

 

hot

 

water

 ‐ 

liquid

 

to

 

flow

 

from

 

the

 

opposite

 

site

 

of

 

the

 

filling.

 

Do

 

not

 

fill

 

the

 

system

 

when

 

the

 

collector

 

has

 

been

 

exposed

 

to

 

sun

 

for

 

more

 

than

 

15

 

min

 

in

 

summer

 

months

 

and

 

more

 

than

 

30

 

min

 

in

 

other

 

cases,

 

because

 

overheating

 

would

 

cause

 

the

 

formation

 

of

 

bubbles

 

in

 

the

 

collector’s

 

loop

 

resulting

 

in

 

malfunctioning.

  

 

9

 

.

 

STORAGE

 

TANK

 

ELECTRICAL

 

CONNECTION

 

 

For

 

hot

 

water

 

during

 

cloudy

 

days

 

,

 

there

 

is

 

the

 

storage

 

tank

 

electric

 

resistance

 

as

 

a

 

backup

 

.

 

 

 

1

 

)

 

Storage

 

tank

 

has

 

to

 

be

 

already

 

full

 

of

 

water

 

.

 

                         

2

 

)

 

Adjust

 

the

 

security

 

thermostat

 

to

 

50

 

 

60

 

°

 

C.

 

                

 
 

 

Summary of Contents for SI 150

Page 1: ...1 INSTALLATION AND MAINTENANCE MANUAL SI 150 2...

Page 2: ...CTOR AND STORAGE TANK INSTALLATION ON MOUNTING KIT 10 5 SI 150 2 ACCESSORIES 11 6 COLLECTOR COUPLING 12 7 FILLING THE COLLECTOR 13 8 VENTILATION 14 9 STORAGE TANK ELECTRICAL CONNECTION 14 10 LIGHTNING...

Page 3: ...opean Norms related to solar systems qualifications In this pamphlet you will find any details necessary for your solar water heater mantling installation and an excellent state of working conditions...

Page 4: ...4 Warrantee...

Page 5: ...low voltage directive harmonized with the ELOT standards EN 60335 EN 60335 2 21 and DIN 4573 Technical documentation required by the conformity procedure is kept at company headquarters COMPANY A et G...

Page 6: ...12976 1 solar water heating system general requirements IV 12976 2 thermal performance of solar domestic water heating systems 1 2 Solar water heater labeling On each solar collector an ineffaceable d...

Page 7: ...7 2 INSTALLATION INSTRUCTIONS SI 150 2...

Page 8: ...8 SI 150 2 Dimensions and weight 1 Mounting kit dimensions 2 Weights Mounting kit 16 kg Collector empty 40 kg Storage tank empty 60 kg...

Page 9: ...ite directions the two supporting blades that you have already mantle and attach them with the diagonal stabilization blades 3 4 using screws and screw nuts Slightly loose screw Choose the place at yo...

Page 10: ...10 4 SI 150 2 COLLECTOR AND STORAGE TANK INSTALLATION ON MOUNTING KIT Having finished mounting kit mantling stabilize the mounting kit on the roof mantling its parts rather loose INSTALLATION STEPS...

Page 11: ...male 1 piece 4 3 Brass male elbow x 1 piece 4 4 Plastic PEX pipe 22 x 3 length 2 50m 1 piece 4 5 Flexible pipe length 0 75m 1 piece 4 6 Female cap 1 piece 4 7 Closed circuit pressure relief safety val...

Page 12: ...12 6 COLLECTOR COUPLING...

Page 13: ...all quantity of water overflows from the short flexible pipe 4 5 sign that collector is full and ventilated 2 Then you connect Filling is done using water and antifreeze The recommended antifreeze is...

Page 14: ...e table i e according to the exterior temperature C under which the system is functioning 8 VENTILATION Special attention is needed to provide adequate ventilation for the collector s so the system ru...

Page 15: ...nect it with collector 11 ANTIFREEZE PROTECTION Depending on the place of the collector s installation there are potential freezing conditions that can cause damage to the collector and the piping Thu...

Page 16: ...ollector to the boiler B with the capacity of the closed system of the storage tank Tables N 1 N 2 TABLE N 1 Propylene glycol solution Temperature Propylene Glycol Water 5 15 85 15 30 70 25 40 60 TABL...

Page 17: ...ny reason there is a need to fill the closed system of the collector with water you should also add antifreeze to retain the ratio according to table No 1 Observe any probable cracking of the collecto...

Page 18: ...ater 2 Valves problem 3 The consumption of hot water is bigger than the appliance s capacity Huge hot water consumption during the night 1 Check the valves and set off the solar water heater valves 2...

Page 19: ...ording papers 1 Date Works Description Accessories Remarks Inspector s name and signature 2 Date Works Description Accessories Remarks Inspector s name and signature 3 Date Works Description Accessori...

Reviews: