63
The LongMill electronics come pre-assembled and are pretty much ready to go out of the box. Here are two
things you can double-check before plugging in and powering-on.
First, check all wires going into green connectors by tugging on them. This includes the wires to the green motor
connectors, green connector from the power supply, and the green connector coming from the e-stop button.
Secure them using the screw terminals and a flat head screwdriver if they’re loose or the wires come out entirely.
Second, confirm the wire order for the power supply and motors. It’s important that the DC power brick has a
white
or
red
wire on the left side and a
black
one on the right when the screw terminal is facing you (as pictured).
Parts Needed:
Control box
Power supply
E-stop
Checking & Plugging In
Small flat head used
Summary of Contents for LongMill MK2
Page 1: ...1 LongMill MK2 Assembly Manual MK2 ...
Page 7: ...7 Part 1 X Z Axes ...
Page 22: ...22 Part 2 Y Axis Gantries ...
Page 34: ...34 You should now have two Y axis rail assemblies They should be a mirror copy of each other ...
Page 35: ...35 Part 3 Axes Completion ...
Page 44: ...44 Part 4 Motors Wiring ...
Page 62: ...62 Part 5 Checks First Moves ...
Page 77: ...77 Part 6 Table Mounting ...