Drag Chain Mount and Connecting Rails
Parts Needed:
36
Previously Assembled
Grab the M5-10mm bolts, t-nuts, and steel drag chain mount from the yellow hardware bag. Prepare the drag
chain mount by loosely threading two M5-10mm bolts into the two t-nuts.
Note: if you want your control box on the right side rather than the left then most of the remaining steps should
be flipped including drag chain mount, subassembly steps, X-axis lead screw and motor, and drag chains.
Leave a gap between the T-nut and mount
Drag chain mount
X-rail
Right Y-rail assembly
T-nut
M5-25mm bolt
M5-10mm bolt
x4
x2
x2
If you want your control box on the right side,
then all the next steps should be flipped
!
Summary of Contents for LongMill MK2
Page 1: ...1 LongMill MK2 Assembly Manual MK2 ...
Page 7: ...7 Part 1 X Z Axes ...
Page 22: ...22 Part 2 Y Axis Gantries ...
Page 34: ...34 You should now have two Y axis rail assemblies They should be a mirror copy of each other ...
Page 35: ...35 Part 3 Axes Completion ...
Page 44: ...44 Part 4 Motors Wiring ...
Page 62: ...62 Part 5 Checks First Moves ...
Page 77: ...77 Part 6 Table Mounting ...