12.96
Transport, Unpacking, Installation
Siemens AG 6SE7087-6BM70
2-1
SIMOVERT MASTER DRIVES Operating Instructions
2
Transport, Unpacking, Installation
2.1
Transport and unpacking
The units are packed in the manufacturing plant corresponding to that specified when ordered. A product packing
label is located on the outside of the packing.
Please observe the instructions on the packaging for transport, storage and professional handling.
For transportation with a fork-lift truck the converter is mounted on a wooden pallet.
Vibration and jolts must be avoided during transport, e.g. when setting the unit down.
The converter can be installed after it has been unpacked and checked to ensure that everything is complete
and that the converter is not damaged.
If the converter is damaged you must inform your shipping company immediately.
The packaging consists of a wooden floor sectionand a PE foil to protect the equipment from humidity. It
can be disposed of in accordance with local regulations.
Depending on the degree of protection and type of construction, the units may be mounted on a pallet either with
or without transport rails.
♦
Degree of prot. IP00
Pallet
•
Type of construction J
one unit
•
Type of construction K
one unit
•
Type of construction M
three units
−
master
drive converter, type of construction K
−
reactor
−
slave
drive converter, type of construction K without electronics box
♦
Degree of prot. IP20
8MC cabinet on transport rails and pallet
•
Type of construction J
one 8MC cabinet
•
Type of construction K
one 8MC cabinet
•
Type of construction M
three 8MC cabinets combined to form a single unit
−
master
type of construction K
−
reactor
−
slave
drive converter, type of construction K without electronics box
Chassis units are supplied, as standard, with degree of protection IP00.
2.2 Storage
The converters must be stored in clean dry rooms.Temperatures between
−
25 °C (
−
13 °F) and + 70 °C (158 °F)
are permissible. Temperature fluctuations > 20 K per hour are not permissible.
WARNING
The equipment should not be stored for longer than one year. If it is stored for longer
periods of time, the converter DC link capacitors must be formed at start-up.
Capacitor forming is described in Part 2 of the Operating Instructions.