● Requirements according to IEC/EN 60204‑1
● Dimensioning for bundled cable routing, e.g. according to DIN VDE 0298 Part 4 or
IEC 60364-5-52
6.1.2
Route the cable with an appropriate loop so that water can drip off
● In case of high humidity or when installed outside, water drops can move along the cable
jacket and enter the motor through the cable entry and cable gland.
If you route the cable with an appropriate loop then water doesn't enter the terminal box,
but simply drips off.
;
;
Figure 6-1
Water drip loop
6.1.3
Terminal designation
According to IEC / EN 60034‑8, the following basic definitions apply to the terminal
designations for 3-phase machines:
Table 6-1
Terminal designations using the 1U1-1 as an example
1 U 1 - 1 Designation
x
Index for pole assignment for pole-changing machines where applicable. A lower
index signifies a lower speed. Special case for split winding.
x
Phase designation U, V, W
x
Index for winding start (1) or end (2) or if there is more than one connection per
winding
x Additional indices for cases in which it is obligatory to connect parallel power feed
cables to several terminals with otherwise identical designations
Electrical connection
6.1 Preparation
SIMOTICS HV M 1RN76308PR900CG0-Z
60
Operating Instructions 07/2018
Summary of Contents for SIMOTICS HV M
Page 2: ...03 07 2018 13 28 V3 00 ...
Page 22: ...Description SIMOTICS HV M 1RN76308PR900CG0 Z 22 Operating Instructions 07 2018 ...
Page 86: ...Operation 8 11 Faults SIMOTICS HV M 1RN76308PR900CG0 Z 86 Operating Instructions 07 2018 ...
Page 122: ...Service and Support SIMOTICS HV M 1RN76308PR900CG0 Z 122 Operating Instructions 07 2018 ...
Page 128: ...Quality documents SIMOTICS HV M 1RN76308PR900CG0 Z 128 Operating Instructions 07 2018 ...
Page 130: ...Additional documents SIMOTICS HV M 1RN76308PR900CG0 Z 130 Operating Instructions 07 2018 ...
Page 135: ......