
Immediately perform an inspection after such faults.
9.1.3
First service after installation or repair
● Check after approx. 500 operating hours, but after not more than one year:
Check
When the
motor is
running
At stand‐
still
The electrical parameters are maintained.
X
The permissible bearing temperatures are not exceeded.
X
The smooth running characteristics and machine running noise have not
deteriorated.
X
The foundation has no cracks or indentations. (*)
X
X
(*) You can perform these checks while the motor is at standstill or, if required, while running.
● Further checks may be required if so specified in operating instructions of components
(Page 129) or in accordance with the plant-specific conditions.
● If you find any deviations during the inspection, you must rectify them immediately. They
may otherwise damage the motor.
Maintenance
9.1 Inspection and maintenance
SIMOTICS HV M 1RN76308PR900CG0-Z
Operating Instructions 07/2018
89
Summary of Contents for SIMOTICS HV M
Page 2: ...03 07 2018 13 28 V3 00 ...
Page 22: ...Description SIMOTICS HV M 1RN76308PR900CG0 Z 22 Operating Instructions 07 2018 ...
Page 86: ...Operation 8 11 Faults SIMOTICS HV M 1RN76308PR900CG0 Z 86 Operating Instructions 07 2018 ...
Page 122: ...Service and Support SIMOTICS HV M 1RN76308PR900CG0 Z 122 Operating Instructions 07 2018 ...
Page 128: ...Quality documents SIMOTICS HV M 1RN76308PR900CG0 Z 128 Operating Instructions 07 2018 ...
Page 130: ...Additional documents SIMOTICS HV M 1RN76308PR900CG0 Z 130 Operating Instructions 07 2018 ...
Page 135: ......