Preparation
2
2.1
2.1
Requirements
Requirements
The following requirements must be fulfilled:
•
An S7-300 station, consisting of:
–
Power supply module (PS), for example, 6ES7 307-1EA00-0AA0
–
CPU 317T-2 DP with inserted MMC (4 MB or more).
–
Optional digital input module (DI) with bus connector, for example,
6ES7 321-1BH02-0AA0
–
Optional digital output module (DO) with bus connector, for example,
6ES7 322-1BH01-0AA0
–
Two optional front connectors for the digital modules
•
A PG with MPI interface and properly installed software packages and commissioning
tools as listed below:
–
STEP 7 V5.3 SP3 and higher
–
S7-Technology V3.0
•
The PG is connected to the CPU via the MPI/DP interface (transmission rate up to 12
Mbps; default 187.5 kbps).
•
A SINAMICS
®
S120 is connected to the CPU 317T-2 DP via the DP (DRIVE) interface.
•
The SINAMICS
®
S120 comprises the following modules:
–
CU320 control unit with TB30 terminal board (6SL3040-0MA00-0AA1)
–
Smart line module, 5 kW (6SL3130-6AE15-0AA0-Z)
–
Single/double motor module, 3 A (6SL3120-2TE13-0AA0-Z)
–
1 synchronous motor 1FK7022-5AK71-1AG3 with incremental encoder sin/cos 1 Vpp
via SMC20 sensor module cabinet (6SL3055-0AA00-5BA1)
–
1 synchronous motor 1FK7022-5AK71-1LG3 with DRIVE-CLiQ interface: Absolute
encoder EnDat 512 pulses/revolution
–
Reference loops for position monitoring
–
Control box for setpoint/actual-value linkage via terminals
•
You know the firmware version of your SINAMICS S120.
CPU 317T-2 DP: Controlling a SINAMICS S120
Getting Started, 12/2005, A5E00480391-01