Preparing for Startup
5-3
IM 178-4
C79000-G7076-C178-01
5.2
Checklist of the Mechanical Construction
Table 5-1
Checklist of the Mechanical Construction
Step
What needs to be done?
1
Installation of the IM 178-4 (see Chapter 2)
-
2
Wiring the IM 178-4 (see Chapter 3)
S
Digital inputs
S
Digital outputs
S
Analog outputs
S
Sensor connections
S
Power supplies
-
-
-
-
3
Peripheral connector
The peripheral connector must be locked and secured by screws.
-
4
Setting the DP address (see Section 5.1)
-
5
Bus connector
The bus connector must be secured by screws
-
6
Check the shields of the individual cables
-
7
Turn on the power supplies
-
5.3
Checklist for Configuration/Parameter Assignment
Table 5-2
Checklist for Configuration/Parameter Assignment
Step
What needs to be done?
1
Have you copied the GSE file and the bitmap file to the local module
catalog? (see Section 4.1)
-
2
Does the PROFIBUS address set on the module match the configured
address?
-
3
Have you set the user-specific parameter assignment data for the DP
attachment to 40
H
, 20
H
, 00
H
? (see Section B.2.2)
-
4
Have you configured the technological slot depending on your requirements
to ”Q4 words/I12 words” or ”Q4 words/I12 words consistent”? (see Section
B.1)
-
5
Have you set the user-specific parameters to values suitable for the position
encoder being used?
-