04/99
Preparations for OP Configuration
Getting Started with C7-621-AS-i
31
To check and, if necessary, correct the PLC parameters, display the dialog box with the PLC para-
meters from the Driver window by activating the
Parameters
button (see dialog box directly below).
When you have entered all the settings, close the dialog box by activating the button
OK
. In the
Projekt Wizard confirm this step with
Weiter >.
Select
Use Standard Projects
and close the Project Wizard with
Fertig stellen
to create the Project
OP_System_1
in ProTool.
Online Help
If there is anything you are unsure of during configuration, or if you want further information on specific
points, press
F1
. This starts the Online Help, in which you will find explanations of the various ProTool
topics.