
PAC2200
Equipment Manual, 12/2019, L1V30415167B-03
63
Commissioning
6
6.1
Overview
Prerequisites
●
The device has been installed.
●
The device has been connected in accordance with the possible connection methods.
Steps for starting up the device
1.
Apply the measuring voltage
2.
Parameterize the device
3.
Check measured values
Note
Check the connections
Incorrect connection can result in malfunctions and failure of the device.
Before starting up the PAC2200, check that all connections are correct.
Note
When performing an insulation test of the entire installation with AC or DC, the device should
be disconnected before starting the test.
Summary of Contents for SENTRON PAC2200
Page 1: ......
Page 2: ......
Page 8: ...Table of contents PAC2200 6 Equipment Manual 12 2019 L1V30415167B 03 ...
Page 14: ...Introduction 1 6 Risk of manipulation PAC2200 12 Equipment Manual 12 2019 L1V30415167B 03 ...
Page 40: ...Description 2 5 Communication PAC2200 38 Equipment Manual 12 2019 L1V30415167B 03 ...
Page 54: ......
Page 84: ...Service and maintenance 7 5 Warranty PAC2200 82 Equipment Manual 12 2019 L1V30415167B 03 ...
Page 96: ...Technical specifications 8 2 Labeling PAC2200 94 Equipment Manual 12 2019 L1V30415167B 03 ...
Page 129: ......
Page 130: ......