6
Smart Infrastructure
A6V11986596_en--_e
Building Products
2022-04-27
Schematic design of a solar protection actuator channel
The following scheme shows the function of a channel of the solar protection actuator using
the “blind” function in a logical context.
Position
Manual operation
Override
Automatic operation
Direct
operation
Calibration
Stop, slats
Solar protection
via dimming
8-bit scene
Position
% control
Central
solar protection
Automatic operation
Send status values
% control
Sunshine
Central solar protection
Override 1 – 7
Direct operation lock
External value
solar protection position
Start calibration of
moving time
8-bit
1-bit
Manual operation
Delay
t
Off
Automatic operation
Delay
t
Status
automatic operation
Override 1 – 7
Direct
operation
Control
Recall/store
positions
≥ 1 active
Overrides
status
Overrides
1 – 7 status
Status direct operation
Status upper end position
Status lower end position
Status moving direction
Status
solar protection position
Status
slat position
Status calibration
moving time
Automatic operation
Override
Direct
operation
Status solar protection
Cali-
bration
Manual operation
Position
Solar protection
Up/Down
Status drive moving