
33
Siemens Industry, Inc.
Meter Installation - Details
This section is intended to support the physical installation of the meter and
provide guidance on connecting the current transformers (CTs) correctly within
the electrical load center and to the MD-xxHD meter.
Meter Mounting Configurations
Siemens MD-xxHD meters are sold in several form factors. Enclosures are designed to be wall mounted
and connected to electrical conduit. Plate mounted versions are ready to be mounted inside a customer
supplied NEMA enclosure.
Mounting Options
MD-48HD
MD-12HD
MD-xxHD Meter
with Enclosure
and Display
MD-48HD-C-D-N
MD-12HD-C-D-N
MD-xxHD Meter
with Enclosure,
NO Display
MD-48HD-C-N-N
MD-12HD-C-N-N
MD-xxHD Meter
with
Mounting Plate
and Display
MD-48HD-P-D-N
MD-12HD-P-D-N
Summary of Contents for MD-12HD
Page 1: ...ii Siemens Industry Inc User Guide MD 12HD MD 48HD Networked Metering Systems A6V11564207 ...
Page 2: ......
Page 27: ...Siemens Industry inc 26 Configuring Electrical Components using ViewPoint HD ...
Page 68: ...67 Siemens Industry Inc Menu Navigation ...
Page 69: ...Siemens Industry inc 68 Communication Navigation ...