See also
Commissioning after storage (Page 36)
4.13.6
Storage for between two and four years
If machines are to be stored for between 2 and 4 years, then also observe the following:
When ordering, the manufacturer must know the storage time.
4.13.6.1
Grease caps
Grease caps must be available at the shaft outlet and at the terminal box cover. Do not rotate
the machine shaft before commissioning as the protective grease coating will be destroyed. If
rotating parts have to be turned, then apply a new protective coating of grease.
4.13.6.2
Commissioning
● Remove the moisture-absorbing substance, such as Branogel, from the terminal boxes
before commissioning.
See also
Commissioning after storage (Page 36)
4.13.7
Storage at low temperatures
4.13.7.1
Storing machines at temperatures down to -50° C
If machines are stored at temperatures of down to -50° C, then also take into account the
following:
● The normal roller bearing grease of machines is suitable for operating temperatures of
between -30 °C and +130° C. Temperatures down to ‑50° C are harmless for the roller
bearing grease if the machine is non operational or is in storage.
For operation at -50 °C, the bearings have a special grease, e.g. Aeroshell Grease 7.
● Machines with regreasing system must be regreased when commissioning. Double the
amount of grease that is specified on the lubricant plate.
4.13.7.2
Regreasing system
● Machines with regreasing system must be regreased when commissioning. Double the
amount of grease that is specified on the lubricant plate.
Preparations for use
4.13 Transport and storage
LOHER CHEMSTAR 1PS2
34
Operating Instructions 08/2016
Summary of Contents for LOHER CHEMSTAR 1PS2
Page 2: ...04 08 2016 11 45 V3 00 ...
Page 64: ...Electrical connection 6 2 Connecting LOHER CHEMSTAR 1PS2 64 Operating Instructions 08 2016 ...
Page 74: ...Start up 7 8 Test run LOHER CHEMSTAR 1PS2 74 Operating Instructions 08 2016 ...
Page 84: ...Operation 8 11 faults LOHER CHEMSTAR 1PS2 84 Operating Instructions 08 2016 ...
Page 102: ...Maintenance 9 2 Corrective Maintenance LOHER CHEMSTAR 1PS2 102 Operating Instructions 08 2016 ...
Page 118: ...Service and Support LOHER CHEMSTAR 1PS2 118 Operating Instructions 08 2016 ...
Page 120: ...Technical data and drawings LOHER CHEMSTAR 1PS2 120 Operating Instructions 08 2016 ...
Page 142: ...Index LOHER CHEMSTAR 1PS2 142 Operating Instructions 08 2016 ...